background image

 

 

2.1. Overhead installation

 

 

Danger of life!
 
You have to observe the regulations of BGV C1 (formerly VBG 70) and 
EN60598-2-17 

The suspension devices have to be build and measured so they can withstand for an hour the tenfold 
of the payload without suffering a permanent detrimental deformation.
 
Basically installation has to be made by using a second separate suspension. This can be e.g. a 
suitable net. The second suspension must be designed and attached so no part of the installation can 
fall down in case of failure. 
 
During construction, reconstruction and deconstruction unnecessary stay in the range of moving 
areas, on lightning bridges, under elevated work stations or any other danger zones is forbidden. 
 
The operator is obliged to following safety
 

 

Before  the  first  start-up  or  after  critical  changes  before  restarting  it  has  to  be  checked  by  an 
expert. 

 

Review in the frame of the inspection test at least all four years by an expert.  .

 

Review by a qualified person at least once a year. 

 
How to carry out the overhead installation:
In tidal fall you should install the device out of the lounge area of people
 
IMPORTANT! Overhead installation requires a high level of experience. This includes knowledge of 
calculating the payload, used installation material and safety inspections of the used material and the 
projector whereas the required experience is not limited to this.
yourself under any circumstances if you are not qualified. Contact a professional installer. An 
inappropriate installation can lead to injuries and/or damaged properties. 
 
It is not allowed to install the device in th
 
If the device may hang from the ceiling or from high beams, the use of truss systems is mandatory. 
The device may not be installed so it can swing freely in the room. 
 
Please note: Crashing down items can cause serious injuries! Do
the safety of a possible installation form!
 
Before installation make sure that the mounting surface has the ability to carry the tenfold point load of 
the own weight of the device. 
 
Mount the device with the mounti
 
During overhead installation the device must be always secured by a safety rope which is designed to 
hold the twelvefold weight of device. Only safety ropes with quick
may be used. Hang up the safety rope in the hole of the mounting bracket. Direct the rope over the 
truss or an appropriate fastening point. Hang up the end in the fastening element and tie up the 
locking nut. A safety rope once exposed to failing
 

5 / 16 

Overhead installation 

Danger of life! 

You have to observe the regulations of BGV C1 (formerly VBG 70) and 

17 Installations are to carry out by skilled personnel only.

The suspension devices have to be build and measured so they can withstand for an hour the tenfold 

without suffering a permanent detrimental deformation. 

Basically installation has to be made by using a second separate suspension. This can be e.g. a 
suitable net. The second suspension must be designed and attached so no part of the installation can 

During construction, reconstruction and deconstruction unnecessary stay in the range of moving 
areas, on lightning bridges, under elevated work stations or any other danger zones is forbidden. 

ing safety-related and mechanical facilities:  

up  or  after  critical  changes  before  restarting  it  has  to  be  checked  by  an 

Review in the frame of the inspection test at least all four years by an expert.  .

ed person at least once a year.  

How to carry out the overhead installation: 
In tidal fall you should install the device out of the lounge area of people 

Overhead installation requires a high level of experience. This includes knowledge of 

calculating the payload, used installation material and safety inspections of the used material and the 
projector whereas the required experience is not limited to this. Do not try to carry out installation 
yourself under any circumstances if you are not qualified. Contact a professional installer. An 
inappropriate installation can lead to injuries and/or damaged properties.  

It is not allowed to install the device in the grip area of people. 

If the device may hang from the ceiling or from high beams, the use of truss systems is mandatory. 
The device may not be installed so it can swing freely in the room.  

Please note: Crashing down items can cause serious injuries! Do not install the projector, if you doubt 
the safety of a possible installation form! 

Before installation make sure that the mounting surface has the ability to carry the tenfold point load of 

Mount the device with the mounting-bracket to your trussing system using an appropriate clamp. 

During overhead installation the device must be always secured by a safety rope which is designed to 
hold the twelvefold weight of device. Only safety ropes with quick-release safety fastener
may be used. Hang up the safety rope in the hole of the mounting bracket. Direct the rope over the 
truss or an appropriate fastening point. Hang up the end in the fastening element and tie up the 
locking nut. A safety rope once exposed to failing load or damaged may not be used furthermore. 

You have to observe the regulations of BGV C1 (formerly VBG 70) and 

Installations are to carry out by skilled personnel only. 

The suspension devices have to be build and measured so they can withstand for an hour the tenfold 

Basically installation has to be made by using a second separate suspension. This can be e.g. a 
suitable net. The second suspension must be designed and attached so no part of the installation can 

During construction, reconstruction and deconstruction unnecessary stay in the range of moving 
areas, on lightning bridges, under elevated work stations or any other danger zones is forbidden.  

up  or  after  critical  changes  before  restarting  it  has  to  be  checked  by  an 

Review in the frame of the inspection test at least all four years by an expert.  . 

Overhead installation requires a high level of experience. This includes knowledge of 

calculating the payload, used installation material and safety inspections of the used material and the 

Do not try to carry out installation 

yourself under any circumstances if you are not qualified. Contact a professional installer. An 

If the device may hang from the ceiling or from high beams, the use of truss systems is mandatory. 

not install the projector, if you doubt 

Before installation make sure that the mounting surface has the ability to carry the tenfold point load of 

bracket to your trussing system using an appropriate clamp.  

During overhead installation the device must be always secured by a safety rope which is designed to 

release safety fastener elements 

may be used. Hang up the safety rope in the hole of the mounting bracket. Direct the rope over the 
truss or an appropriate fastening point. Hang up the end in the fastening element and tie up the 

load or damaged may not be used furthermore.  

Содержание LED PAR XS 7X15W RGBW IP65

Страница 1: ...Manual LED Quad Par XS 7x15W RGBW 4in1 IP65...

Страница 2: ...al connections 7 4 2 DMX connections 7 4 3 DMX connection with terminator 7 5 Control 8 5 1 Structure of the menu 8 6 DMX chart 10 6 1 DMX mode STAG 11 channels 10 6 2 DMX mode Arc 1 3 channels 12 6 3...

Страница 3: ...original parts as spare parts Make sure to unplug the power supply before opening the housing For safe and efficient operation Be careful with heat and extreme temperature Avoid exposing it to direct...

Страница 4: ...bracket is obligatory Surrounding objects or surfaces should not be in contact with the device Make sure that during the installation and removal of the device the area below the place of installation...

Страница 5: ...he inspection test at least all four years by an expert ed person at least once a year How to carry out the overhead installation In tidal fall you should install the device out of the lounge area of...

Страница 6: ...maximum drop exceed must not exceed 20cm A safety rope once exposed to failing load or damaged may not be used furthermore Adjust the desired inclination angle via the mounting bracket and tighten th...

Страница 7: ...DMX512 connection go ahead like it is described in the picture Make sure that you use shielded cable 3pole or 5pole XLR cables are suitable If you use a controller with a 5 pin DMX output connector yo...

Страница 8: ...255 S0 S20 t000 t255 F000 F255 SET UPLd With this function you can upload customer programs to another device For this you need to enter a password ENTER UP DOWN UP DOWN ENTER While uploading the devi...

Страница 9: ...d ENTER UP DOWN UP DOWN ENTER STAT R000 R255 Dimmer red 0 100 G000 G255 Dimmer green 0 100 B000 B255 Dimmer blue 0 100 W000 W255 Dimmer white 0 100 S00 S20 Strobe slow fast AUTO AT01 AT10 Choosing an...

Страница 10: ...W0 71 80 R100 G0 B0 W up 81 90 R100 G0 B0 W down 91 100 R up G down B0 W0 R down G up B0 W0 101 110 R up G0 B down W0 R down G0 B up W0 111 120 R0 G up B down W0 R0 G down B up W0 121 130 R up G up B...

Страница 11: ...matic program 7 80 89 Automatic program 8 90 99 Automatic program 9 100 109 Automatic program 10 110 119 Customer program 1 120 129 Customer program 2 130 139 Customer program 3 140 149 Customer progr...

Страница 12: ...27 ID 38 250 ID 61 180 189 ID 18 228 ID 39 251 ID 62 190 199 ID 19 229 ID 40 252 ID 63 200 209 ID 20 230 ID 41 253 ID 64 231 ID 42 254 ID 65 232 ID 43 255 ID 66 6 2 DMX mode Arc 1 3 channels Channel V...

Страница 13: ...100 5 0 255 Dimmer white 0 100 6 6 DMX mode Ar2 S 6 channels Channel Value from Value to Function 1 0 255 Dimmer 0 100 2 0 255 Dimmer red 0 100 3 0 255 Dimmer green 0 100 4 0 255 Dimmer blue 0 100 5...

Страница 14: ...m RGBW Power 105 W Number Power 7 x 15 W Optics Beam angle 8 Connections Power in IP65 Power out IP65 XLR in out IP65 Controlling Sound to Light No Automatic Yes Master Slave Yes DMX512 Yes Number of...

Страница 15: ...15 16...

Страница 16: ...16 16 Importer B K Braun GmbH Industriestra e 2 D 76307 Karlsbad www bkbraun com info bkbraun com...

Отзывы: