![VARSITY Scoreboards 3420 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/varsity-scoreboards/3420/3420_installation-manual_3573209013.webp)
13
5 /
Lift the assembly from the
top angle irons to a vertical
position, still resting on the
ground and install the top
sponsor panel if included in
the installation. (refer to
page 14 for sponsor panel
instructions)
TOP OF SCOREBOARD
Mounting Flat Stock
Mounting Flat Stock
3/8” x 1 1/2” Bolts
3/8” x 1 1/2” Bolts
6 /
Pick the scoreboard up high
enough to install the bottom
sponsor panel if included in
the installation.
7 /
Raise the scoreboard to the
mounting poles or I Beams
and at the proper height, use
a clamp at one pole or I beam
to hold that corner in place.
8 /
Using a level in the top chan-
nel of the scoreboard, slowly
raise the scoreboard to level
it and clamp to the other end
mounting pole or I Beam.
9 /
Weld or bolt the mounting
angle to the poles or I Beams
you are clamped to and follow
the same procedure at the
bottom of the scoreboard,
clamp and weld or bolt. Follow
by welding or bolting the
angle to the center pole or I
Beam at the top and bottom.
It may be necessary to use
clamps here as well.
10 /
If any other options were
purchased, install them by
referring to their specific
installation instructions.
4 /
Connect ALL crossover
cables between cabinets as in
the
“Cable Connections” image
below, making sure the red
stripe on the edge of the
ribbon cables are aligned
when connected
. The power
harnesses are male/female
and cannot be connected
incorrectly.
Crossover Ribbon
10 Pin Header
Power Harness
Crossover Ribbon