
6
To pr
a filte
rating
Bend
shou
Start-u
At the p
avoid c
recomm
Prior to
Check
Check
require
Piping
technic
joints a
electric
Check
correct
in parti
fluid to
All pum
with the
pressu
Check
Do not
Consul
been s
Check
Followi
pump a
revent entry
er rating ne
g must be s
ds in the pip
uld be avoid
V6, 12, V
up and pla
pump start-u
costly incide
mended for
o starting t
the alignme
that the filte
ed to have u
must not ex
cal section.
are installed
c motor's po
that the pum
tly mounted.
cular on a s
be pumped
mps are prot
e pumped f
re gauge an
that the oil
use the ge
lt customer
old.
that all valv
ing pump st
and inspect
y of foreign
eeds to be
sufficiently l
ping laid sho
ed.
Pu
V20, V25-2,
cing out of
up phase, p
nts - See in
start-up.
the pump,
ent of the pu
er and the p
undergone a
xert an exce
Where the
d in the pipin
ower and th
mp's directi
. Move the
self-priming
d or a fluid t
tected durin
fluid the pum
nd a vacuum
reservoir in
ar pump for
service if fl
ves are ope
tarting, che
t both the pu
matter, whi
installed o
arge since
ould have a
ump type
V30-2, V60
f service
articular car
the manua
it is crucia
ump with the
piping are fr
a leakage te
essive load
liquid can re
ng. Check t
he sense of
on of rotatio
pump shaft
g pump, mus
that is comp
ng installatio
mp must be
m gauge.
n the vicinity
r tests or fin
uids need t
en.
ck that fluid
ump and th
Page
21
ch may res
n the inlet s
it affects th
a radius as
0-2, V80.-2
re must be t
ls of the var
al that the f
e supporting
ree from rem
est.
on the pum
each high te
the motor’s
f rotation.
on is correc
and check
st not be dr
patible with
on by a pas
e removed a
y of the sea
nal acceptan
to be pumpe
d has entere
e system if
ult in destru
side. Given
he pump's s
large as pra
, V100-2
taken to me
rious pump v
following c
g structure
mainders, s
mp casing. S
emperature
s electrical c
t. The safet
to be sure
ry. Fill or lub
the latter.
ssivating oily
and cleaned
l/gasket is f
nce tests w
ed which dif
ed and the p
the pump is
uction of the
n its inner flo
suction capa
actical. Sm
Filter ra
et the requi
versions wh
checks be c
as may be
small welde
See the max
es it must be
connections
ty relief valv
that it rotate
bricate the i
y liquid. If th
d. Prepare t
filled.
with water.
ffer from tho
pump functi
s still runnin
e pump, a su
ow resistan
acity.
all-angle pip
ating [mm]
0.5
rements list
hich spare p
conducted
provided, a
d pieces, et
x. permissib
e ensured th
s, the balan
ve (if to be in
es freely. T
nternal com
he latter is n
he taps for
ose for whic
ions proper
ng dry after
uction filter
ce, the filte
pe elbows
ted below so
arts are
d:
nd the moto
tc. Flanges
ble loads in
hat expansi
ncing of the
nstalled) mu
he pump in
mponents w
not compati
connecting
ch the pump
ly. Stop the
one minute
with
er
o as to
or.
are
the
ion
ust be
terior,
ith the
ible
a
p has
e
e.
Содержание V 100-2
Страница 1: ...Operating Manual V Series Internal Gear Pumps with Magnetic Coupling ...
Страница 28: ...Page 28 9 3 Disassembly of the pump casing 01 Unscrew the screws 44 and pull off the casing 01 ...
Страница 34: ...Page 34 ...
Страница 35: ...Page 35 ...