Page 15
CHAPTER 2 - INSTALLATION
CONTINUATION ...
How to calculate the calibration:
Calculate the time needed by the actuator to completely
open (in minutes) and complete the following
calculation:
(Opening time x 4) ________minutes
+ (Parameter PAUS setting time delay x 3)
+________minutes
= Calibration total time =________minutes
www.monitrol.com
Содержание SVIM-1LE
Страница 1: ...SVIM 1LE User s Manual www monitrol com ...
Страница 11: ...Page 11 Fig 2 SVIM 1LE Wiring Diagram CHAPTER 1 INSTALLATION www monitrol com ...
Страница 16: ...Page 16 SVIM 1LE Fig 3 Connection of actuator motor with HIRED HAND PVR 2 switch box www monitrol com ...
Страница 17: ...Page 17 Fig 4 Connection of actuator motor with a 3 phase motor CHAPTER 2 INSTALLATION www monitrol com ...
Страница 18: ...Page 18 SVIM 1LE www monitrol com ...
Страница 19: ...Page 19 CHAPTER 3 USER S GUIDE www monitrol com ...
Страница 30: ...Page 30 SVIM 1LE NOTES www monitrol com ...
Страница 31: ...Page 31 APPENDIX APPENDIX www monitrol com ...
Страница 36: ...MAV SVIM 1LE VER 04 01 July 17 2001 Chip 110e www monitrol com ...