background image

SECTION IV - MAINTENANCE

87-900-865-01 (B)

9

During start-up

without Soft Start

mode

After start-up

With

48

dummy

load

With 78

dummy

load

With 48

dummy

load

With

78

dummy

load

Current

±10%

1.62 A

1.1 A

1 A

1 A

Power ±10%

80 W

58 W

30 W

48 W

Speed

±4KRPM

17

70

40

63

Temperature

±2°C

52° C

52° C

52° C

52° C

– Check the 3-phase ac output voltage.

After start up it should be:

36 Vac with 78

 dummy load and

21 Vac with 48

 du y load.

Switch off the controller and remove the power cable.

4-2.3 Pump over-temperature test

– Disconnect the potentiometer, set it to 5K

, and

then reconnect it.

– Disconnect the dummy loads.

– Connect the power cable.

– Switch on the controller.

– Check the 3-phase ac output voltage.

It should be zero.

– Switch off the controller and remove

power cable.

4-2.4 Functional test

Perform the functional test with the turbo-pump, taking

care to check the ramp sequence and start up time.

DISPOSAL

Meaning of the "WEEE" logo found in labels

The following symbol is applied in accordance with the

EC WEEE (Waste Electrical and Electronic Equipment)

Directive.
This symbol (

valid only in countries of the European

Community

) indicates that the product it applies to

must NOT be disposed of together with ordinary

domestic or industrial waste but must be sent to a

differentiated waste collection system.

The end user is therefore invited to contact the supplier

of the device, whether the Parent Company or a

retailer, to initiate the collection and disposal process

after checking the contractual terms and conditions of

sale.

Содержание Turbo-V60

Страница 1: ...87 900 865 01 B JULY 2006 GB INSTRUCTION MANUAL Turbo V60 Leak Detector PCB Controller Model 969 9840 vacuum technologies...

Страница 2: ...Turbo V 60 Leak Detector PCB Controller...

Страница 3: ......

Страница 4: ......

Страница 5: ...er outline 3 II Installation 2 1 General 4 2 2 Line voltage selection 4 2 3 Power interconnections 4 2 4 Input Output interconnections 5 2 5 Turbo V pump connection 5 III Operation 3 1 General 6 3 2 S...

Страница 6: ...operation maintenance manuals and any additional information provided by Varian All warnings and cautions should be read carefully and strictly observed Address any safety operation and or maintenance...

Страница 7: ...g power supply and 3 phase output analog and input output section microprocessor and digital section Controller to pump interconnection cable The power supply and the 3 phase output converts the singl...

Страница 8: ...e Frequency Power 54 Vac nominal 10 3 phase 1167 Hz 2 150 W maximum Operating temperaure 0 C to 40 C Storage temperature 20 C to 70 C J2 optoisolator input 4 to 12 Vdc J2 optoisolator output ICsat 1 6...

Страница 9: ...controller can operates with two ranges of input voltage 120 Vac 20 220 Vac 20 The line voltage selection is done on the three pin male connector on the primary wires of the transformer for 120 Vac co...

Страница 10: ...Input A determines the controller mode of operation according to the following truth table INPUT SIGNAL LOGIC LEVEL CONTROL UNIT CONDITION A B LOW LOW LOW FREQUENCY LOW HIGH HIGH FREQUENCY HIGH LOW HI...

Страница 11: ...t Start mode enabled that allows the pump to ramp up to Normal speed slowly with a minimum ramp up time of 75 seconds and a maximum of about 45 minutes If it is necessary to deselct this mode refer to...

Страница 12: ...ssary to set the Input A and Input B signals on J15 connector both to high logic level 3 6 Power failure In the event of a power failure momentary or long term the Turbo V controller will stop the tur...

Страница 13: ...irected in Fig 4 1 Figure 4 1 Dummy load connections 4 2 1 Power supply test a DC voltage test Check the DC voltages referring to test points indicated in Fig 4 2 Refer also to Figg 4 3 and 4 4 The me...

Страница 14: ...3 phase ac output voltage It should be zero Switch off the controller and remove power cable 4 2 4 Functional test Perform the functional test with the turbo pump taking care to check the ramp sequen...

Страница 15: ...SECTION IV MAINTENANCE 87 900 865 01 B 10 Figure 4 1...

Страница 16: ...TIFICATION Product Description Varian P N Varian S N Purchase Reference TYPE OF RETURN check appropriate box Paid Exchange Paid Repair Warranty Exchange Warranty Repair Loaner Return Credit Shipping E...

Страница 17: ...rate No zero high backround Gauge tube not working Display problem Vacuum system unstable Cannot reach test mode Communication failure Degas not working Failed to start Other Error code on display Oth...

Страница 18: ...1263 Toll Free 0120 655 040 Korea Varian Technologies Korea Ltd Shinsa 2nd Bldg 2F 966 5 Daechi dong Kangnam gu Seoul Korea 135 280 Tel 82 2 3452 2452 Fax 82 2 3452 2451 Toll Free 080 222 2452 Mexico...

Отзывы: