DOC: 3900GC TEST STATION
DESC: 3900GC GALILEO TEST
PAGE:
REV
9 of 12
1
PREPARED BY: Sax Makthepharack REVISED BY:
CONTROL: INDUSTRIAL ENGINEERING
REV. DATE:
SHOWN
-
10 - 10 - 00
Bob Jolley
1.4.2
In the list, click on Leak_Test_3900.mth and then click
open
.
1.4.3
In the Injector EFC Status block, the Type 1 Pressure Setpoint and the Actual Pressure should go to 80.0 psi. Note: Assure Col Oven and
1177 Actual temperatures stabilize at the Set values.
1.4.4
After the Stabilization Time has reached zero, and the Start button has become active, then click the
Start button
, turn off the helium and
record the Actual Pressure value. This will be your beginning value.
1.4.5
After the Runtime reaches 5.00 min, record the Actual Pressure value. This will be your ending value.
1.4.6
The difference between the beginning and ending values should be less than 0.4 psi.
1.4.7
Turn helium back on.