background image

 

 

Page 12 of 18 

 
 

Vapor Power International LLC 

551 S County Line Road, Franklin Park, Il 60115 

Phone:  630-694-5500    Fax:  630-694-2230 

 

Upon  completion  of  the  control  circuit  checkout,  de-energize  the  control 

circuit, remove the jumpers and replace fuses, if applicable, and switch all of 

the circuit enable switches to the off position. 

 

4.3.2

 

Cleaning Boiler Interior 

Prior to start-up, the boiler interior should be cleaned to remove oil, mill 
scale and other construction and installation contaminants.  A commercial 
boiler “Boil Out” compound should be used, per their procedure, with the 
boiler completely flooded.  In lieu of a commercial boil out compound, the 
following mix of chemicals can be used for every 250 gallons of water: 
 

·

 

30  lbs tri-sodium phosphate (Na

3

 PO

4

·

 

5 lbs  caustic soda (NaOH) 

·

 

2 lbs  ordinary detergent 

 
These chemicals should be dissolved in warm water prior to their addition to 
the boiler.  The boil-out can be accomplished per the following procedure: 
 
1)

 

Remove all tools, rags, etc. from the boiler.   

2)

 

Remove steam outlet piping. 

3)

 

Fill boiler to just below the handhole/manhole with feedwater. 

4)

 

Add the chemical solution thru the handhole/manhole. 

5)

 

Close handhole/manhole. 

6)

 

Fill boiler until water level is just below the steam outlet 

7)

 

Energize the main power supply by closing the customer’s branch circuit 

 

power switch. 

8)

 

Make sure that all step toggle switches are in the off position, and then 

 

energize the control circuit   

 

 

 

9)

 

Operate 1 or 2  heater circuits (approx 10% of boiler capacity) to raise 

 

water temperature. 

10)

 

Once steam is observed at the steam outlet, allow boiler to boil for 2-3 

 

hours.  Note:  Heater circuits may have to be de-energized during this 

 

period to control the boil rate.. 

11)

 

Switch control circuit off and de-energize main  power supply 

12)

 

Drain boiler. 

13)

 

Open handhole/manhole 

14)

 

Rinse all walls and surfaces thoroughly with a garden hose 

15)

 

Re-install steam outlet piping 

 

 
 
 

Содержание STR

Страница 1: ...Page 1 of 18 Vapor Power International LLC 551 S County Line Road Franklin Park Il 60115 Phone 630 694 5500 Fax 630 694 2230 Instruction Manual STR MODEL RESISTO FLO ELECTRIC BOILER...

Страница 2: ...compact packaged unit requiring a minimum of electrical and plumbing connections at the jobsite When installed according to these instruction the boiler will provide years of reliable low maintenance...

Страница 3: ...lation drawing and also that it is in accordance with the minimum spacing specified on the UL label if provided CAUTION ALL BOILERS EXCEPT MODELS STR 1638 THRU 1654 ARE TO BE MOUNTED ON NONCOMBUSTIBLE...

Страница 4: ...Minimum thermal clearances should be maintained If the boiler is UL listed minimum clearances will be indicated on the UL Label Otherwise consult local codes and use good engineering judgement CAUTIO...

Страница 5: ...NDED THAT ALL PIPING BE CHECKED FOR LEAKS BEFORE INSULATING 2 2 WATER SUPPLY AND CONDENSATE RETURN If a direct water feed is used ie no condensate return the main water supply must have a pressure at...

Страница 6: ...ITATE DRAINING THE BOILER BY GRAVITY IE WITHOUT BOILER PRESSURE 2 3 1 SURFACE BLOWDOWN If the boiler is supplied with an automatic surface blow down valve pipe to a point common with the bottom blowdo...

Страница 7: ...which must swing freely and point to the index mark on the case 2 7 HYDRO TEST Good practice as well as most local codes dictates that a hydro static test at a pressure equal to the safety valve setti...

Страница 8: ...ple conductors per phase be certain that phasing is correct and that circuits are not mixed before energizing the boiler 3 2 GROUNDING Connect an equipment ground minimum copper wire size is indicated...

Страница 9: ...such materials must be removed from the boiler prior to start up D All power wiring connections should be checked to assure tight connections NOTE HYDRO STEAM INDUSTRIES AS MANUFACTURER OF THIS BOILER...

Страница 10: ...e vendor supplied literature provided at the rear of this manual 4 2 2 Pressure Control Boilers supplied with one or more non proportioning pressure controls Smaller STR boilers are provided with one...

Страница 11: ...customer s 120V branch circuit power switch if a control circuit transformer is provided remove both the primary and secondary fuses and jump a 120V power supply to the secondary of the control transf...

Страница 12: ...water prior to their addition to the boiler The boil out can be accomplished per the following procedure 1 Remove all tools rags etc from the boiler 2 Remove steam outlet piping 3 Fill boiler to just...

Страница 13: ...establish a load on the boiler Individually check each element circuit to assure that each leg is drawing its rated current NOTE SOME POWER FUSES MAY BLOW AT STARTING DUE TO WATER OR OTHER CONTAMINATI...

Страница 14: ...all circuits draw rated current no element tests are required If element failure is suspected the elements should be checked individually with an ohmmeter Grounded elements may require a Megger for d...

Страница 15: ...r to the boiler 2 Drain boiler below level of flange containing defective element 3 Number and tag element wires and terminals to assure proper reassembly 4 Disconnect element wires to the flange 5 Re...

Страница 16: ...NT FLANGE ELEMENT TIGHTEN 70 FT LBS MAX BRASS 110 FT LBS MAX S S TIGHTEN ENOUGH TO BULGE RUBBER SEAT IN FLANGE 5 3 4 Probes Level probes should be periodically checked If there is any seepage between...

Страница 17: ...Page 17 of 18 Vapor Power International LLC 551 S County Line Road Franklin Park Il 60115 Phone 630 694 5500 Fax 630 694 2230...

Страница 18: ...Page 18 of 18 Vapor Power International LLC 551 S County Line Road Franklin Park Il 60115 Phone 630 694 5500 Fax 630 694 2230...

Отзывы: