AIR N ARC
®
150 SERIES
SECTION 5: MAINTENANCE
090051-OP_r0 (FEB-2014)
PAGE - 27
Vanair Manufacturing, Inc.
vanair.com • 800-526-8817
9
Inspect unit fo
r oi
l leaks or
dama
g
e
•
•
•••
Visua
lly note any le
aks
o
r evi
dence
o
f
le
aks a
round
the
compre
sso
r un
it a
nd
ho
se co
nne
ctio
ns.
T
ighten
a
n
y l
oose
con
nection po
int where ne
eded
.
Re
pair or repla
c
e
a
n
y damag
ed part.
10
Inspect
co
oler fins (b
oth engi
ne
and
co
mp
ressor oil cool
ers)
for
contamin
ation
•
•
•••
Cle
an or clea
r as nece
s
sa
ry. Use onl
y
lo
w pressure a
ir to cle
an coo
ler fins; do
no
t use hi
gh pressure
ai
r
n
o
r
a
pre
s
su
re
w
a
sher.
IM
PORTANT:
Do
no
t clea
n radia
to
r wi
th firm
tool
s such as spatul
as
o
r
screwdrivers. Such
instruments ma
y da
ma
g
e
th
e
fins or tu
bes,
a
nd/or cause
coo
lant lea
k
s or decrea
s
e
co
ol
in
g pe
rf
orm
a
n
c
e
.
11
Inspect ve
ntilatio
n
open
ing
s
•
•
•••
Ensure
o
peni
ngs are not blo
c
ke
d or
clo
gged
wi
th
d
ebris. C
lean
o
r cle
a
r a
s
necessary.
12
Cle
an and
i
n
spect co
mpressor
air filters.
•
•
•••
Re
place
if air fi
lter
memb
ra
ne is worn,
con
tai
ns tea
rs
or pi
nhol
es, or if
fil
te
r is
da
ma
ged
.
13
Che
c
k/cle
an all
externa
l parts
of
co
mp
ressor and drive
r
•
•
•••
A dail
y
visu
al inspe
c
ti
on will
h
e
lp to
pre
v
e
n
t dirt and
deb
ri
s buil
d
-up, wh
ich
can
affect machi
ne
op
eration.
Wh
en clea
nin
g
e
x
te
rn
al pa
rts,
al
ways wait
for machin
e
surfaces to
co
ol down
b
e
fore
wip
ing
o
ff.
C
o
n
ti
n
ued
on
n
ext pa
ge
5.3 MAINTE
NANCE SCHEDULE
WARNING
Bef
o
re perf
ormin
g
m
aint
enan
ce:
Shut
do
wn
mac
h
ine
, r
e
lieve all sys
tem
p
res
sure an
d lo
ck ou
t all p
o
wer
,
as per t
h
e
Safety Section
of this m
anu
al.
NO
TE THA
T
THE SYSTEM CAN BE
S
T
ARTED
REMOTEL
Y
:
Always cle
arly t
ag
th
e st
art-u
p
ins
trum
e
nt
atio
n ag
ainst
accid
e
nt
al syst
em
st
art
-up
s d
u
ring
mai
n
ten
a
nce
.
IN
TER
V
ALS
NOTE
S
y
st
em
m
a
in
te
n
a
nc
e
pe
rs
on
nel
must
be
f
a
mi
li
ar
w
ith al
l Sa
fety
re
gul
ati
o
ns set
forth i
n
the Safe
ty
Secti
o
n
of
thi
s
ma
nua
l
bef
o
re
pe
rf
o
rmin
g
ma
in
te
na
nce on
th
is
ma
chi
n
e
.
BRE
AK
-I
N
PE
RIO
D
MAINTE
NA
NCE
SC
HED
ULE
Hou
rly or Calend
ar
P
e
ri
od
-
whic
heve
r comes
fi
rs
t
If
wo
rki
n
g
in
d
u
sty or d
irty
co
nd
itio
ns,
red
u
ce th
e
re
comm
end
e
d
time
inter
vals
b
etwe
en serv
ic
in
g
by hal
f
fo
r
en
gi
n
e
an
d co
mpr
esso
r oil
c
h
an
ge
, an
d
eng
in
e
an
d co
mpr
ess
or filter
ser
vicing
.
First 20
Hour
s of
Operatio
n
After 8
Hour
s or
Dail
y
Every 100
Hour
s or
One Year
Every 200
Hours
After 300
Hours
After 500
Hours
KEY
TAS
K
DESCRIPTION
ACTION TO
TAKE
R
E
FERENCE