background image

Panel: maximum dimensions 1800x1100 mm (21 kg)

Panel: maximum dimensions 2100x1100 mm (24 kg)

 

Windmap Belgium

Required ballast  |  Belgium

 
General

The ValkTriple® mounting system must be reinforced by means of tiles, which must be placed on the 
indicated ballast foundations. In 

three steps

 you can easily calculate the required ballast; 

 

 

• determine the wind area on the windmap

 

• choose the wind area and building height in the table

 

• you can now read the number of tiles / kg

 

Note 1:

 The extra ballast must be equally divided over the ballast foundations.

Note 2:

 

The max. of 32 tiles can be placed for extra ballast (288 kg).

Building height

0 - 5 

meter

5 - 7 

meter

7 - 9 

meter

9 - 12 

meter

12 - 15 

meter

23 m/s

11,0

45,0

71,0

103,0

128,0

kg

1,5

5,0

8,0

11,5

14,5

tiles

24 m/s

30,0

67,0

96,0

130,0

158,0

kg

3,5

7,5

11,0

14,5

18,0

tiles

25 m/s

50,0

90,0

121,0

158,0

188,0

kg

6,0

10,0

13,5

18,0

21,0

tiles

26 m/s

70,0

113,0

147,0

188,0

220,0

kg

8,0

13,0

16,5

21,0

24,5

tiles

Building height

0 - 5 

meter

5 - 7 

meter

7 - 9 

meter

9 - 12 

meter

12 - 15 

meter

23 m/s

38,0

77,0

108,0

145,0

174,0

kg

4,5

9,0

12,0

16,5

19,5

tiles

24 m/s

60,0

103,0

136,0

176,0

209,0

kg

7,0

11,5

15,5

20,0

23,5

tiles

25 m/s

83,0

129,0

166,0

209,0

244,0

kg

9,5

14,5

18,5

23,5

27,5

tiles

26 m/s

106,0

157,0

196,0

244,0

281,0

kg

12,0

17,5

22,0

27,5

31,5

tiles

Environmental factors

Position   

 

Middle zone roof

Terrain category   

III (villages, suburban terrain, permanent forest)

Roofing  materials  

Bitumen

X

 = the required ballast is higher than will fit under the system. The system must be mechanically attached to the roof. Please contact Van der Valk Solar Systems. 

*  If you use tiles of different sizes and thus another weight, you need to adjust the number of tiles to get the right weight.

Ballast foundations

Содержание ValkTriple

Страница 1: ...Installation manual ValkTriple Version 01 December 2021...

Страница 2: ...le zone of the roof Index Disclaimer Select wind area Page Required ballast Page Required tools Page 00a Required materials Page 00b General dimensions Page 00c Placing roof carriers Page 01 A frame c...

Страница 3: ...n calculation Mounting systems for PV panels placed on flat roofs should either be mechanically attached to the roof or need to be supported by ballast to make sure that the solar mounting system is u...

Страница 4: ...er I 29 5 m s 213 0 213 0 264 0 X X kg 24 0 24 0 29 5 X X tiles II 27 m s 142 0 142 0 184 0 235 0 276 0 kg 16 0 16 0 20 5 26 5 31 0 tiles III 24 5 m s 78 0 78 0 112 0 154 0 187 0 kg 9 0 9 0 12 5 17 5...

Страница 5: ...0 158 0 kg 3 5 7 5 11 0 14 5 18 0 tiles 25 m s 50 0 90 0 121 0 158 0 188 0 kg 6 0 10 0 13 5 18 0 21 0 tiles 26 m s 70 0 113 0 147 0 188 0 220 0 kg 8 0 13 0 16 5 21 0 24 5 tiles Building height 0 5 met...

Страница 6: ...65 0 65 0 kg 7 5 7 5 7 5 7 5 7 5 tiles 3 27 5 m s 121 0 121 0 121 0 121 0 121 0 kg 13 5 13 5 13 5 13 5 13 5 tiles 4 30 m s 183 0 183 0 183 0 183 0 183 0 kg 20 5 20 5 20 5 20 5 20 5 tiles Building heig...

Страница 7: ...indmap United Kingdom Required ballast United Kingdom General The ValkTriple mounting system must be reinforced by means of tiles which must be placed on the indicated ballast foundations In three ste...

Страница 8: ...iles which must be placed on the indicated ballast foundations In three steps you can easily calculate the required ballast determine the wind area on the windmap choose the wind area and building hei...

Страница 9: ...m s 244 0 244 0 265 0 X X kg 27 5 27 5 29 5 X X tiles 31 m s X X X X X kg X X X X X tiles Building height 0 5 meter 5 7 meter 7 9 meter 9 12 meter 12 15 meter 22 m s 88 0 88 0 103 0 138 0 167 0 kg 10...

Страница 10: ...nicipalities Aurland 25 Eid 26 Fjaler 26 F rde 26 F rde near the Jostedalsbreen 26 Gaular 26 Gloppen 26 Gloppen near the lfotbreen and Jostedalsbreen 26 Hornindal 26 Hyllestad 26 H yanger 26 L rdal 26...

Страница 11: ...s 5 0 38 0 65 0 96 0 121 0 kg 1 0 4 5 7 5 11 0 13 5 tiles 25 m s 23 0 59 0 87 0 121 0 149 0 kg 3 0 7 0 10 0 13 5 17 0 tiles 26 m s 41 0 80 0 111 0 148 0 177 0 kg 5 0 9 0 12 5 16 5 20 0 tiles Building...

Страница 12: ...8 0 11 0 15 0 18 0 tiles 26 m s 124 0 175 0 215 0 263 0 X kg 14 0 19 5 24 0 29 5 X tiles Building height 0 5 meter 5 7 meter 7 9 meter 9 12 meter 12 15 meter 21 m s 37 0 76 0 107 0 143 0 172 0 kg 4 5...

Страница 13: ...r 12 15 meter 1 58 0 82 0 101 0 124 0 144 0 kg 6 5 9 5 11 5 14 0 16 0 tiles 2 161 0 194 0 221 0 254 0 281 0 kg 18 0 22 0 25 0 28 5 31 5 tiles 3 58 0 82 0 101 0 124 0 144 0 kg 6 5 9 5 11 5 14 0 16 0 ti...

Страница 14: ...0 147 0 184 0 228 0 264 0 kg 14 0 16 5 20 5 25 5 29 5 tiles 27 m s 150 0 174 0 214 0 262 0 X kg 17 0 19 5 24 0 29 5 X tiles 29 m s 205 0 232 0 278 0 X X kg 23 0 26 0 31 0 X X tiles Building height 0 5...

Страница 15: ...ng height 0 5 meter 5 7 meter 7 9 meter 9 12 meter 12 15 meter 27 m s 150 0 174 0 214 0 262 0 X kg 17 0 19 5 24 0 29 5 X tiles 30 m s 233 0 262 0 X X X kg 26 0 29 5 X X X tiles Building height 0 5 met...

Страница 16: ...00 Recommended installation tools ValkTriple Cordless drill for socket 13 and bit T 30 Socket 13 Torx bit T 30 Measuring tape Wrench 13...

Страница 17: ...n Page 03 Alu profile 2100mm 7272100 Alu profile 1010mm 7271010 Alu extension profile 757050 1010 1046 mm 757051 1038 1065 mm 757052 1065 1100 mm Installation Page 04 Alu hinge 50mm 724450 Installatio...

Страница 18: ...00 10 3109 680 600 1700 3128 Advised pitch measure 5000 Based on sun angle of 14 5 2700 825 Panel Length P a n e l th ic k n e s s 2 8 5 0...

Страница 19: ...w Detail B 1 Detail B 2 Front view 825 3rd hole Place the mass block on the rubber tile carriers Detail B 3 15 Nm Attention the 1600mm roof carrier is placed in front of the 1000mm roof carrier Mount...

Страница 20: ...he groove on the bolt corresponds with the orientation of the bolt head A A A 5th to last hole 2nd hole Detail B 15 Nm Mount the connector pieces on the roof carriers Make sure they are placed as show...

Страница 21: ...Detail A A The groove on the bolt corresponds with the orientation of the bolt head Detail B A 4th Hole 4th hole from end roof carrier 15 Nm Mount the push rods on the roof carriers to connect the two...

Страница 22: ...e aluminium profile with the connector pieces coupling first Then mount the profile to the roof carrier ValkHint ValkHint Detail A A Detail A 2 15 Nm 15 Nm 15 Nm Mount in 3rd hole Mount in last hole M...

Страница 23: ...04 2 Detail A A Side view Extension piece for panel width 757050 1010 1046 mm 757051 1038 1065 mm 757052 1065 1100 mm...

Страница 24: ...05 A Detail A Mount the push rods between the aluminium profile and the roof carrier Diagonal rod M8x80 15 Nm M8x80 15 Nm...

Страница 25: ...06 A Detail A For the required number of tiles check the ballast tables in front of this manual 15 Nm A 2 extra tiles 4 extra tiles 6 extra tiles 8 extra tiles...

Страница 26: ...if it s slot for an easier assembly Step 2 Step 3 Panel height Step 4 Put the end clamp in the right slot to contine the assembly Step 5 8 Nm The end clamp can only be turned clockwise so make sure t...

Страница 27: ...08 A A Detail A Attention Do not forget to install the end clamp above the third panel Same installation as other end clamps page 07 A A 8 Nm Step 1...

Страница 28: ...09 Mount cable clamp on the panel...

Отзывы: