23
GB
9.694.004 V1.04
ENGLISH
MD 850
Troubleshooting and Maintenance
Maintenance Information
!
Please use only
genuine HAWO replacement parts.
Replacing Teflon strip for upper and lower heating die
Switch off machine and DISCONNET POWER PLUG !
Open housing
Remove mounting screws
for upper guide rail and remove guide rail
.
Disconnect electrical connections for heating die
Remove fastening srew
and at the bottom
Remove top or bottom heating die
Unscrew mounting screw
and detach teflon strip
Remove backing foil on new Teflon strip and glue newe Teflon strip on straight and without wrinkels
Fasten Teflon strip with screw
Install heating die
Fasten fastening screws
+
of the heating die
Reconnect electrical connections to heating die
Detach nuts
Set distance between the
sealing dies to 0.5 mm
Fasten nuts
Install guide rails.
When installing the upper guide rail before fastening , push the die down so that the interval
between the srew head and rail is 1mm on both sides.
This ensures the correct contact pressure for the guide rail
Close housing
5
Distance between screw head and rail = 1mm
0, 5
mm