
www.Valtir.com
14
Revision B December 2022
MP-3 Polyester Anchoring System
Assembly and Safety Instructions
Important:
Read all instructions and materials thoroughly before
proceeding
.
1.
Do not allow contact with skin
or eyes. Use only in a well-
ventilated area. Do not use near
open flame.
2.
Wear safety goggles. If
possible, use the part to be
anchored as a drilling template.
Drill the holes 1/8" larger than
the stud diameter to the
recommended depth, using a
two fluted rotary percussive drill.
Full strength will not be achieved
if a diamond drill is used. Check
to be sure all holes are drilled to
the proper depth and aligned
with the part to be anchored.
3.
While wearing safety glasses,
blow the concrete dust from the
hole, using oil-free compressed
air. Thoroughly clean the hole
with a stiff-bristled brush, and
then blow it out again. If the hole
is wet, completely flush it with
water while brushing. Then blow
it clean using oil-free
compressed air.
4.
While wearing gloves and
safety goggles, remove the lids
from the MP-3 Part A-Resin and
Part B-Hardener containers.
Pour Part B into Part A and mix
vigorously for 30 seconds to
form MP-3 grout. (An anchor
stud may serve as a stirring rod.)
5.
For faster hardening in cold
weather, Promoter may be used.
Do not use Promoter when the
temperature is above 60°F
.
Add the entire contents of the
Promoter container to the MP-3
grout and mix for an additional
30 seconds. Use immediately,
the MP-3 grout will thicken
quickly.
6.
Position the part to be
anchored over the clean holes.
Crimp the mouth of the can to
form a spout and pour the MP-3
grout mixture down into the hole
through the part. Fill 1/3 of the
hole. Do not over- or under-fill
the hole.
Содержание Vulcan Barrier System CEN
Страница 1: ...PN 617902 REVISION B DECEMBER 2022 VulcanTM Barrier System CEN ASSEMBLY AND ANCHORING MANUAL...
Страница 8: ...www Valtir com 7 Revision B December 2022 Figure 1 Freestanding Configuration Not H2...
Страница 9: ...www Valtir com 8 Revision B December 2022 Figure 2 Anchored Configuration...
Страница 10: ...www Valtir com 9 Revision B December 2022 Figure 3 Anchored Configuration...
Страница 11: ...www Valtir com 10 Revision B December 2022 Figure 4 Freestanding End Treatment...
Страница 19: ...www Valtir com 18 Revision B December 2022 Assembly Drawing 616960 Sheet 1 Vulcan 12m VULCAN 12M Drawings...
Страница 20: ...www Valtir com 19 Revision B December 2022 Assembly Drawing 616960 Sheet 2 Vulcan 12m...
Страница 21: ...www Valtir com 20 Revision B December 2022 Assembly Drawing 616960 Sheet 3 Vulcan 12m...
Страница 22: ...www Valtir com 21 Revision B December 2022 Assembly Drawing 616960 Sheet 4 Vulcan 12m...
Страница 23: ...www Valtir com 22 Revision B December 2022 Assembly Drawing 616961 Sheet 1 Vulcan 4m VULCAN 4M Drawings...
Страница 24: ...www Valtir com 23 Revision B December 2022 Assembly Drawing 616961 Sheet 2 Vulcan 4m...
Страница 25: ...www Valtir com 24 Revision B December 2022 Assembly Drawing 616961 Sheet 3 Vulcan 4m...
Страница 26: ...www Valtir com 25 Revision B December 2022 Notes...
Страница 27: ...www Valtir com 26 Revision B December 2022 Notes...