79
Rough Frame Openings
Min. 1” below
ȴQLVKHGFHLOLQJ
LDK 1 = 49”
LDK 4 = 39”
LDK 1 & LDK 4
LDK 3
LDK 3 = 15”
4”
5-1/2”
LDK 1 = 13”
LDK 4 = 11”
)UDPLQJRQHGJH
Top of
plenum
VXSSRUW
)UDPLQJRQHGJH
Min. 1” below
ȴQLVKHGFHLOLQJ
8VHVWHHOVWXGIRU
/;DSSOLDQFHV
8”
CL
Rough Frame Opening
Rough
Frame
Opening
See Installation
Manual packed
with appliance
for minimum
combustible
cavity dimensions
Note - Min. cavity
dimensions may
be dictated by
LDK plenum when
installing across
corners.
LX2 models
using 8” venting
may require a
YHQWRVHWWR
clear the plenum.
Min. 1/2”
clearance to
combustibles
at ends
Use steel stud
for LX2 appliances
See detail
LDK 1 = 49”
LDK 4 = 39”
LDK 3 = 15”
LDK 1 = 4”
LDK 4 = 4”
LDK 3 = 8”
2 x 4 steel stud
Framing on edge
5”
Framing and Clearances
!
Appendix D - HeatShift
®
Installation
Содержание LX2 2200KN
Страница 47: ...47 1 2 3 4 5 6 7 1 2 3 4 5 6 7 8 9 10 11 5 6 7 8 9 10 11 Logs installed full layout Installation Fuel Beds ...
Страница 85: ...85 LDK4 LDK3 LDK5 LDK6 LDK2 LDK7 LDK1 Appendix D HeatShift Installation ...
Страница 90: ...90 1700BLK 101 102 103 100 1700SWK 3 2 1 5 6 7 8 9 10 11 4 104 105 106 Appendix E Spare Parts ...