Ceramic Rocks Installation (739IR)
4. The underside of each ceramic rock is
identi
fi
ed by a number and a speci
fi
c protruding
positioning triangle.
Install the six rocks from left to right starting
with rock no. 1.
5. Place the glass panel in its cavity formed by the
Front Support and the Ceramic Platform.
6. Place the left twig across the
second and third rocks from the
left
; rest its end on the glass
near the edge of the platform
as shown.
Make sure to leave
a gap between the twig and the fi rst rock
to allow fl ame to come up between the twig
and the rock.
7. Place the right twig across the
second and third rocks from the
right
; rest its end on the glass
about 1 cm from the edge of the
platform as shown.
Make sure
to leave a gap between the twig and the fi rst
rock to allow fl ame to come up between the
twig and the rock.
All Rocks
Installed
Rock
identi
fi
cation
Triangular
hole in
ceramic
base
A black discoloration may form over time at
the front bottom of the 6-rock original fuel
bed; this deposit can be burned off by running
the
fi
replace on a low to medium setting
fi
re
for 30 to 45 minutes. This discoloration is
unavoidable and will re-form again.
28
QUALIFIED
INSTALLER