
5
FITTING THE CERAMICS
Place the front base coal in the burner compartment so that it rests on the ledges at the sides and front. Pull the coal forward sot hat it
is immediately behind the front rim of the burner compartment. (See Fig 3).
Place the rear base coal matrix in the burner compartment behind the front coal. It should rest on the ledge at the back of the burner
compartment. (See Figure 4).
Install the 14 loose coals as follows. Begin the coal build by placing a single coal in the centre of the front coal, ensuring that it bridges
across to the matrix as shown in figure 5.
Place the other 4 coals resting between the front coal and the coal matrix (2 each side of the first). Please note the coals should bridge
across the front coal to the rear coal matrix not placed in between. (See Figure 6).
Figure 4 Rear Base Matrix positioning
Figure 3 Front Base Coal Positioning
Figure 5 Front Row of Coals in Position
Figure 6 Positioning Front Row of Coals