Valor 719 Скачать руководство пользователя страница 10

FUEL BED REFITTING

1. 

Place the rear base coal in the firebox.

It should rest on the ledges at the rear
sides of the burner unit. When located
gently move the rear base coal so that it is
as far forward as possible. The amount of
movement will be negligible (See figure
4).

2.

Place the front base coal in the firebox

with its bottom front locating over the
front rim of the firebox. Pull the coal
forward so that it locates immediately
behind the front rim of the
firebox. (See figure 5).The front
base coal will touch the rear base
coal as it is located. 

There are two types of loose
coals. These are identified with
the letter “A” or “B” on the
underside of the coal.
There are three “A” coals and
two “B” coals. 

3.

Place a type “A” coal between

the front and rear base coals with
the letter “A” upright and so that
the coal is against the left side of
the firebox. See figure 6.

Page 10

OWNER GUIDE

Figure 6.

Figure 5. Front base
coal position

Figure 4. Rear Base Coal Position

Содержание 719

Страница 1: ...S G31 THIS APPLIANCE IS SUITABLE ONLY FOR INSTALLATION IN THE UNITED KINGDOM GB AND THE REPUBLIC OF IRELAND IE Model 719 GC No 32 032 53 INSET LIVE FUEL EFFECT GAS FIRE INCORPORATING THE VALOR CONTROL...

Страница 2: ...s a member of the Society of British Gas Industries which works to ensure high standards of safety quality and performance Careful Installation Valor is a CORGI registered company All our gas fires mu...

Страница 3: ...SEFUL TELEPHONE NUMBERS 13 This gas fire is designed to meet the most stringent quality performance and safety requirements to provide you with many years trouble free service This guide aims to impro...

Страница 4: ...the installation instructions Do provide a minimum clearance of 750mm from the top surface of the hearth to any shelf made of wood or other combustible material where the shelf is not more than 150mm...

Страница 5: ...become discoloured when close to a heating appliance Please bear this in mind whenever you are considering redecorating Do provide a minimum side clearance as detailed in figure 1 Please bear this in...

Страница 6: ...atural gas input of 2 7kW Gross Has a minimum natural gas output of 1 3kW Model 719 when converted using kit number 0595221 Has a maximum propane gas input of 6 1kW Gross Has a maximum propane gas out...

Страница 7: ...light To light the fire The slide control is shown in figure 2 1 Slide the control button to the bottom ignition position marked In this position the electronic ignition system should cause a series o...

Страница 8: ...will only be apparent after a somewhat longer time iii The appliance will operate to its maximum potential if the flue is primed during the first 20 30 minutes of operation To do this simply slide the...

Страница 9: ...res Excessive exposure to this material may cause irritation to eyes skin and respiratory tract Consequently it is important to take care when handling these articles to ensure that the release of dus...

Страница 10: ...Pull the coal forward so that it locates immediately behind the front rim of the firebox See figure 5 The front base coal will touch the rear base coal as it is located There are two types of loose c...

Страница 11: ...se coals The letter B should be upright The coal should touch the right side of the firebox See figure 9 7 Place the remaining type A coal between the front and rear base coals The letter A should be...

Страница 12: ...a Valor service engineer or a CORGI registered installer If you require your fire to be serviced please contact Valor Service on 08706 090 081 and quote the following details Model name and number App...

Страница 13: ...ire to be serviced VALOR SERVICE 08706 090 081 For sales or product information VALOR SALES 08706 061 067 For spares inquiries Spare parts are available nationwide via the interpart stockist network F...

Отзывы: