Valor 2200KN Скачать руководство пользователя страница 61

61

State of Massachusetts Carbon Monoxide 

Detector/Vent Terminal Signage 

Requirements

For all side wall horizontally vented gas fueled 

equipment installed in every dwelling, building or 

structure used in whole or in part for residential 

purposes, including those owned or operated by the 

Commonwealth and where the side wall exhaust 

vent termination is less than seven (7) feet above 

fi

 nished grade in the area of the venting, including 

but not limited to decks and porches, the following 

requirements shall be satis

fi

 ed: 

1. INSTALLATION OF CARBON MONOXIDE DETECTORS. 

At the time of installation of the side wall horizontal 

vented gas fueled equipment, the installing plumber 

or gas 

fi

 tter shall observe that a hard wired carbon 

monoxide detector with an alarm and battery back-up 

is installed on the 

fl

 oor level where the gas equipment 

is to be installed. In addition, the installing plumber 

or gas 

fi

 tter shall observe that a battery operated 

or hard wired carbon monoxide detector with an 

alarm is installed on each additional level of the 

dwelling, building or structure served by the side wall 

horizontal vented gas fueled equipment. It shall be 

the responsibility of the property owner to secure 

the services of quali

fi

 ed licensed professionals for the 

installation of hard wired carbon monoxide detectors.

a. In the event that the side wall horizontally vented 

gas fueled equipment is installed in a crawl space or an 

attic, the hard wired carbon monoxide detector with 

alarm and battery back-up may be installed on the next 

adjacent 

fl

 oor level.

b. In the event that the requirements of this subdivision 

can not be met at the time of completion of installation, 

the owner shall have a period of thirty (30) days 

to comply with the above requirements; provided, 

however, that during said thirty (30) day period, a 

battery operated carbon monoxide detector with an 

alarm shall be installed.

2. APPROVED CARBON MONOXIDE DETECTORS. Each 

carbon monoxide detector as required in accordance 

with the above provisions shall comply with NFPA 720 

and be ANSI/UL 2034 listed and IAS certi

fi

 ed. 

3. SIGNAGE. A metal or plastic identi

fi

 cation plate 

shall be permanently mounted to the exterior of the 

building at a minimum height of eight (8) feet above 

grade directly in line with the exhaust vent terminal for 

the horizontally vented gas fueled heating appliance or 

equipment. The sign shall read, in print size no less than 

one-half (1/2) inch in size, “GAS VENT DIRECTLY BELOW. 

KEEP CLEAR OF ALL OBSTRUCTIONS”.

4. INSPECTION. The state or local gas inspector of the 

side wall horizontally vented gas fueled equipment shall 

not approve the installation unless, upon inspection, 

the inspector observes carbon monoxide detectors and 

signage installed in accordance with the provisions of 

248 CMR 5.08(2)(a)1 through 4. 

(b) EXEMPTIONS: The following equipment is exempt 

from 248 CMR 5.08(2)(a)1 through 4: 

1. The equipment listed in Chapter 10 entitled 

“Equipment Not Required To Be Vented” in the most 

current edition of NFPA 54 as adopted by the Board; 

and 

2. Product Approved side wall horizontally vented gas 

fueled equipment installed in a room or structure 

separate from the dwelling, building or structure used 

in whole or in part for residential purposes. 

Commonwealth of Massachusetts

Содержание 2200KN

Страница 1: ...tructions If you cannot reach your gas supplier call the fire department Installation and service must be performed by a qualified installer service agency or the gas supplier Hot glass will cause bur...

Страница 2: ...h Vancouver BC Canada V7H 3B1 T 604 984 3496 F 604 984 0246 valorfireplaces com This appliance may be installed in an after market permanently located manufactured mobile home where not prohibited by...

Страница 3: ...8 22 Restrictors 23 Wall Termination 24 Roof Termination 25 Preparation 26 Window Removal 26 Stando s Adapter 27 Installation 28 Electrical Wiring 28 Gas Supply 29 Remote Battery Wall Switch Kit 31 Wi...

Страница 4: ...ss of 200 F 93 C depending on elevation of hearth Be careful of touching these Tem perature of projection surfaces will be reduced when barrier screens are installed Some materials or items although s...

Страница 5: ...bited Fireplace Safety Intended use This appliance is designed and approved as a supple mental heater and provides the potential for most energy conservation when used while attended The use of an alt...

Страница 6: ...please consult provincial and or local authorities having jurisdiction Model 2200KN 2200KP Gas Natural Propane Altitude Ft 0 4 500 feet Input Maximum Btu h 36 000 36 000 Input Minimum Btu h 19 000 21...

Страница 7: ...Liners 2200LML Limestone Liners HeatShift LDK1 Quad Plenum 48 LDK3 Double Plenum 14 2 with Grille LDK4 Quad Plenum 38 LDK7 Duct Termination Plates valance outlet LDK9 Quad Plenum 30 Gas Conversion Kit...

Страница 8: ...ff Lifting handles removeable 1 2 13 mm finishing flanges Lifting handles removeable Temporary valve access Temporary valve access during installation Center of vent 17 17 432 mm 2 5 1 4 133 mm 11 1 4...

Страница 9: ...nt sheet Also check that you have fuel bed packed separately liners packed separately Remote Battery Wall Switch Kit RBSWK HeatShift Kit mandatory Gas conversion kit if necessary Venting accessories E...

Страница 10: ...ick allowed below opening Combustible projections must otherwise be kept min 4 below opening HeatShift front outlet HeatShift sides outlet Remote Control Handset Wall Holder Wall Finish above opening...

Страница 11: ...ensions around fireplace opening must be non combustible material Non combustible wall finish here separating cavity from combustible projections Fireplace opening Non combustible wall finish here sep...

Страница 12: ...ely 6 1 2 165 mm if using 8 vent 7 3 16 183 mm if using 6 5 8 vent from back surface of wall finish to front surface of appliance case w no vent offset 11 1 2 292 mm 17 432 mm 11 279 mm Min 16 1 2 419...

Страница 13: ...this dimension Alternatively substituting a 24 inch pipe length for the min 12 inch section will add 12 inches to this dimension as there is no additional pipe joint 5 1 4 133 mm Max 12 305 mm length...

Страница 14: ...ipe joint For example an additional 12 inch pipe section will add approximately 10 1 2 inches overall to this dimension 5 1 4 133 mm Max 24 610 mm length at this height 5 x 8 elbow directly on applian...

Страница 15: ...nual HeatShift plenum framing required front or sides see instructions packed with HeatShift kit DO NOT use screws in this zone Combustible wall finish 52 1321 mm max 20 508 mm min 44 1 2 1130 mm min...

Страница 16: ...2 419 mm DO NOT use screws in this zone Combustible material allowed on rear wall if framed forward up to flanged opening Combustible construction with plywood base below appliance is okay Steel fram...

Страница 17: ...unplastered shall be considered combustible materials Non combustible cement board The LX2 fireplace requires a 1 2 13 mm thick non combustible cement board to be used as a wall surface immediately a...

Страница 18: ...8 length when drying from a saturated condition Running the fireplace before final finishing will help drive out moisture Always pre drill screw holes through cement board and use screws with self mil...

Страница 19: ...nstallation Framing Vent in Combustible Walls Ceilings 6 5 8 and 8 pipes When penetrating through combustible walls and ceilings frame a minimum of 10 in x 10 in opening and ensure that the insulation...

Страница 20: ...8 VENT ADAPTER SUPPLIED 5 x 8 VENT OUTLET PIPE LENGTH PIPE LENGTH CEILING FIRESTOP ATTIC FIRESTOP ATTIC INSULATION SHIELD FLASHING STORM COLLAR VERTICAL TERMINATION 90 ELBOW 90 ELBOW 90 ELBOW 90 ELBO...

Страница 21: ...Any combination of rise and run can be used as long as they are within the allowable limits shown on the chart below 5 A maximum of 4 x 90 degrees elbows or equiva lent 2 x 45 degrees 90 degrees can b...

Страница 22: ...ith roof termination is 6 feet 4 Any combination of rise and run can be used as long as they are within the allowable limits shown on the chart below 5 A maximum of 4 x 90 degrees elbows or equiva len...

Страница 23: ...e top panel To access the restrictors remove the top panel 1 Remove 4 screws along the front or back of the panel 2 Release 4 screws along the other side of the panel It is not neces sary to remove th...

Страница 24: ...egulator assembly located within 15 feet 4 6bm below the terminal 36 90 I Clearance to service regulator vent outlet 36 90 J Clearance to non mechanical air supply inlet to the building or the combust...

Страница 25: ...er 9 12 to 10 12 2 5 Over 10 12 to 11 12 3 25 Over 11 12 to 12 12 4 Over 12 12 to 14 12 5 Overhang should not extend beyond vent if within 48 of termination cap Horizontal overhang Vertical wall Min 2...

Страница 26: ...Remove Window Sill and Window Remove window sill Lift the sill up to free the magnets underneath then pull it straight out Remove the window 1 Hook the window handle to one of the spring load ed windo...

Страница 27: ...supporting that is it NOT supported by the engine Fit 6 5 8 x 4 Vent Adapter if required This unit is supplied with a 5 x 8 vent outlet which can be field converted to a 4 x 6 5 8 vent outlet by insta...

Страница 28: ...window It is hidden under the valve shield The v module is powered by a three prong plug plugged into a receptacle inside the appliance case at the rear on the left hand side RBWSK power connector RB...

Страница 29: ...nce The unit is supplied with a stainless steel flex line to allow the appliance to be disconnected for service An individual shut o valve supplied is required on the supply line ahead of the flex con...

Страница 30: ...hut o valve Test for leaks by applying a liquid detergent or soap solution to all joints Bubbles forming indicate a gas leak WARNING Never use an open flame to check for leaks Correct any leak detedte...

Страница 31: ...eiver at the front of the appliance 2 Pull out the receiver from its location to connect the wiring harness power connector to receiver s jack 3 Connect the harness white connector to the auxil lary 5...

Страница 32: ...to the box us ing 4 screws provided 11 Feed the cable tie through the 2 side slots of the battery cover assembly 12 Position the battery holder to the rear face and secure together with a cable tie No...

Страница 33: ...network See the literature that accompanies the WiFi module kit for instructions to install and set up See also Wiring Diagram on page 58 Note The homeowner will either need to be present for install...

Страница 34: ...wever they don t fit into each other They sit beside each other Installation 1 Unpack the liner panels carefully 2 Remove the rear media tray 3 screws Ceramic liner panel sections top view 3 Inside th...

Страница 35: ...Two brick retainers and three glass retainers are supplied with the panels They are used to hold the bottom of the rear panels against the rear wall of the firebox The brick retainers have a shallowe...

Страница 36: ...Carefully unpack the kit as the logs are fragile Installation Fuel Beds Installation 1 Place log L2 with pin inserted as shown 2 Place log L1 from the left end of L2 and across the burner to rest on...

Страница 37: ...as shown 6 Place log L6 from the top of L5 onto the front of the media tray as shown L5 L2 L12 L4 L2 L12 L5 L5 L4 L6 7 Remove and discard the pin from log L8 8 Place log L8 across the burner at the r...

Страница 38: ...o the media tray and burner Do not pour embers as dust could block burner ports Place splinters among embers when complete WARNING CHOKING HAZARD Ensure that the fireplace area is clear of ember and s...

Страница 39: ...o not pour from the bag and do not pour too much to avoid blocking the burner ports NOTE Ensure the area within the pilot shield is clear of vermiculite Some vermiculite can be deposited into the pilo...

Страница 40: ...ner and behind as indicated This ver miculite will help keep the right rear log in position 5 Place the right rear log as indicated The small end of the log rests on the burner 1 3 4 inch from the fro...

Страница 41: ...installed 8 Vermiculite may be added outside the burner on the platform if desired around the logs 9 Place the rocks on the platform as shown below Installation WARNING CHOKING HAZARD Ensure that the...

Страница 42: ...layer to the level of the top edge of the flange around the burner Do not pour directly from the bag and do not pour too much to avoid blocking the burner ports NOTE Ensure the areas within the pilot...

Страница 43: ...the rear media tray and one for the front media tray Use the fourth bag to fill up gaps or edges of the burner NOTE Ensure the areas within the pilot shield and pilot safe zone are clear of fireglass...

Страница 44: ...es in the media tray Some logs straddle the burner make sure they rest over the smaller burner ports rather than the larger ones Large ports Do not place logs on Large ports Square hole use the square...

Страница 45: ...urner ports Log 6 straddles the burner do not cover the large burner ports Log 5 rests on rear notch of log 6 4 5 5 7 6 6 Installation Log 7 rests on front notch of log 6 Log 9 straddles the burner do...

Страница 46: ...tail 11 10 Log 10 rests on the rear and the right edge of the media tray wrapping around the corner of the burner Note the right side of the log does NOT touch the window Installation Log 11 rests on...

Страница 47: ...47 1 2 3 4 5 6 7 1 2 3 4 5 6 7 8 9 10 11 5 6 7 8 9 10 11 Logs installed full layout Installation Fuel Beds...

Страница 48: ...the embers NOTE Ensure the areas within the pilot shield and pilot safe zone are clear of embers or splinters Pilot shield Pilot safe zone Installation IMPORTANT Approved for use only with the ce rami...

Страница 49: ...d and in pilot safe zone are clear of shale Do not put rocks on the pilot shield 2 Place rocks around the shale bed as indicated These rocks will be used to support the twigs The rocks used is not imp...

Страница 50: ...d shale provided with your Valor fire place The use of any other products may void your fireplace warranty WARNING CHOKING HAZARD Ensure that the fireplace area is clear of shale pieces as these could...

Страница 51: ...x See Window Removal on page 26 for details on removing the windows from the fireplace Change Bulbs Wear gloves when changing these bulbs Most manufacturers recommend never touching them as oil from y...

Страница 52: ...the window pane 3 Insert the window behind the appliance s front panel and lower it into its bottom rail Installation 4 Push the top of the window pane against the fire box Ensure it is centered on t...

Страница 53: ...o the fireplace may result To ensure safe operation Double check that the bottom of each window frame is correctly installed in the bottom support railing Verify that the retainer hooks are hooked pro...

Страница 54: ...ld to the right and locate the receiver Detach it from the Velcro and pull it out 3 Locate the Reset button on the top side of the re ceiver 4 With a thin object press and hold the receiver s RESET bu...

Страница 55: ...re provided with the kit Cover the screws with the included caps to finish the mounting Once mounted the holder is magnetic simply place the remote gently into the holder IMPORTANT The location of the...

Страница 56: ...ons the flame picture may be improved by adjusting the aeration The need for adjustment should be determined only by operating the appliance with the fuel bed liners and window installed and evaluatin...

Страница 57: ...1 Starting with the side screens place each screen magnets inboard against the ridge of the window sill push the top of the screen against the ridge of the top plate 2 Place the front screen magnets...

Страница 58: ...Wifi Module optional LIGHT POWER V Module 120V Low voltage AC Power Lights MAN Knob Combination Control Valve Main Valve Knob PANEL red yellow Receiver Antenna RESET Button RBWSK Connector Battery Hol...

Страница 59: ...3 LJK LQG R D LDO 9 9 9 9 70 697 69 9 WHQGHG R D LDO 9 9 9 9 6QRUNHO 5LVH 7 67 70 67 6 6QRUNHO 5LVH 7 67 70 67 6 GMXVWDEOH 3LSH HQJWK DQG 3LSH WHQVLRQV DOYDQL HG RU ODFN 9 9 WR 7 RU WR WR 7 DOYDQL HG...

Страница 60: ...ROODU 9 6 9 6 7 6 70 6 69 6 HFRUDWLYH 3ODWH 9 9 7 6 70 75 70 73 69 3 3 DWKHGUDO HLOLQJ 6XSSRUW 9 6 9 6 7 6 70 66 56 7 HLOLQJ LUHVWRS ORRU 6XSSRUW 9 6 9 6 7 6 70 7 6 70 6 69 63 69 6 WWLF 5DGLDWLRQ 6KL...

Страница 61: ...xt adjacent floor level b In the event that the requirements of this subdivision can not be met at the time of completion of installation the owner shall have a period of thirty 30 days to comply with...

Страница 62: ...side wall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases but identifies special venting systems the following requirements shall be satisfied by the man...

Страница 63: ...IRU JDV LQFOXGLQJ QHDU WKH RRU I RX VPHOO JDV 6723 ROORZ LQ WKH VDIHW LQIRUPDWLRQ DERYH RQ WKLV ODEHO I RX GRQ W VPHOO JDV JR WR WKH QH W VWHS 8720 7 1 7 21 0 1 NQRE LQ 21 SRVLWLRQ QVXUH ODPH GMXVWPHQ...

Страница 64: ...Eco Mode F or C To Turn On Fire One Button lighting default Two Button lighting simultaneously Press and hold for 4 seconds until 8 short beeps and a blinking series of lines con rms the start sequen...

Страница 65: ...untdown Timer AM AM To deactivate functions 1 Install batteries All icons are displayed and ashing 2 While the icons are ashing press the relevant func tion button and hold for 10 seconds 3 The functi...

Страница 66: ...ntdown Timer only works in Manual Thermostatic and Eco modes Maximum countdown time is 9 hours and 50 minutes Light Dimmer Operation On Press is displayed Light is on at preset level Off Press disappe...

Страница 67: ...WiFi the handset will display APP Manual Mode The on o status of the replace as well as ame height are manually controlled by the user PM ON OFF PM PM Thermostatic Mode On Press is displayed Preset t...

Страница 68: ...To con rm press ON ON Off Time Setting PROGRAM 1 1 1 OFF are displayed ALL is displayed brie y Hour ashes 2 To select hour press or 3 To con rm press 1 OFF are displayed ALL displayed brie y Minutes...

Страница 69: ...a short circuit Low Battery Receiver With low battery power in the battery holder the system shuts o the re completely This will not happen if the power is completely interrupted Seven Day Shut Off Th...

Страница 70: ...no pilot ame No gas supply Air in pilot supply line No spark Reversed polarity in thermocouple wiring Incorrect pilot ori ce if valve has been converted from LPG to NG or vice versa F07 Low battery s...

Страница 71: ...ss and hold large flame button to gradually increase flame height Press and hold small flame button to gradually decrease flame height The Wall Switch can be used to control your fireplace You can tur...

Страница 72: ...Flexible aluminum duct is acceptable provided it meets the UL 181 Class 1 requirements Note These instructions are to be used in conjunction with instructions regarding replace installation in this m...

Страница 73: ...rately 38 frame white 2 14 x 6 grilles included white 4 take off collars included 4 take off collars included 4 take off collars included LDK2 supplied separately 48 frame white Kits Contents 39 5 8 1...

Страница 74: ...eplace With LDK7 WARNING The plenum duct kits are approved for horizontal discharge ONLY The termination duct plates are approved for vertical upward discharge ONLY DO NOT install plenum or terminatio...

Страница 75: ...le or rigid 5 diameter UL 181 Class 1 Air Duct 4 use LDK6 kit or equivalent Min 2 1 2 clearance to ceiling Min 30 Max 12 0 6HH WDEOH IRU R VHWV LX2 33 1 4 LX2 5 1 4 LX2 17 LX2 11 Ceiling Min 1 clearan...

Страница 76: ...t or equivalent Min 2 1 2 opening required at ceiling Min 30 Max 12 0 6HH WDEOH IRU R VHWV Min 14 LX2 33 1 4 LX2 5 1 4 LX2 17 LX2 11 Ceiling Min 1 clearance to combustibles around pipe Note Discharge...

Страница 77: ...wable Horizontal Offset X offset for take off that s furthest away Ceiling LDK 1 LDK 3 or LDK 4 Min bend radius Top of fireplace Min 1 clearance to combustibles around pipes Support horizontal section...

Страница 78: ...mounting bracket and 1 2 standoff 3 1 2 standoff 3 5 8 7 7 8 11 1 2 Top View Front View Right Side View LDK 4 38 LDK 4 5 dia collars 4 C L 8 14 8 4 4 3 3 5 8 7 7 8 11 1 2 1 2 standoff Front View Top...

Страница 79: ...doff 8 11 1 2 1 2 wallboard 1 2 standoffs Front View Right Side View 1 2 standoff LDK 9 30 LDK 9 5 dia collars 4 C L 7 1 16 7 1 16 7 1 16 4 3 8 4 3 8 3 9 1 2 Front View Top View 2 6 9 1 2 6 4 1 2 wall...

Страница 80: ...7 4 1 2 9 3 4 9 3 4 4 1 2 19 1 2 2 1 2 13 1 2 16 19 1 2 9 3 4 9 3 4 Stand offs fold down for shipping Warning Label Stand offs Front View Top View Right Side View Perimeter of plates may be trimmed to...

Страница 81: ...4 LDK 3 LDK 3 15 4 5 LDK 1 13 LDK 4 11 UDPLQJ RQ HGJH Top of plenum VXSSRUW UDPLQJ RQ HGJH Min 1 below QLVKHG FHLOLQJ 8VH VWHHO VWXG IRU DSSOLDQFHV 8 C L LDK9 Minimum 31 4 LDK 9 Min 1 below QLVKHG FH...

Страница 82: ...dictated by LDK plenum when installing across corners LX2 models using 8 venting PD UHTXLUH D YHQW R VHW WR clear the plenum Min 1 2 clearance to combustibles at ends Use steel stud for LX2 appliances...

Страница 83: ...pipes Framing on edge 1 1 2 min clearance to combustibles top Ceiling Min 2 1 2 clearance to ceiling 1 2 1 2 min clearance to combustibles rear sides 1 min clearance to combustibles all around pipes 4...

Страница 84: ...s as necessary maintain 1 clearance to pipes Wall finish required to form plenum above duct termination plates LDK 7 Duct Termination Plates 2 for horizontal installation ONLY Continuous ceiling requi...

Страница 85: ...d off Non combustible zone above plates Perimeter of plates may be trimmed to suit installation Combustible framing allowed below plates 5 dia pipes maintain 1 clearance to combustible materials Front...

Страница 86: ...he collars and secure it with gear clamps provided DO NOT SPLICE DUCTS 6 Attach the top of the pipe sections to the plenum securing them with the gear clamps provided An upward slope must be maintaine...

Страница 87: ...cessary to maintain the pipes posi tions Support horizontal sections every 24 inches 7 Continue with the replace installation Description Part no LDK1 48 Quad Hot Air Plenum Kit 48 x 2 quad plenum 400...

Страница 88: ...4006367 67 Murano glass platform front 4005729 68 Murano glass platform rear 4005738 Description Part No 1 Vent reducer converts to 4 x 6 5 8 58DVA X46 2 Window assembly left 4005724 3 Window assembly...

Страница 89: ...k Grey Rock S4 B 8 4002341 93 No 7 Grey 5 Matte pitted rock 4002650 94 No 9 Grey 5 Matte rock 2 4002652 95 No 11 Grey 3 Matte rock 2 4002654 96 No 14 Grey 9 Gloss rock 4002657 97 No 16 Warm Grey 3 Glo...

Страница 90: ...6 8 A B B 9 13 14 15 16 3 17 11 12 10 7 56a 56b 56c 56d 56e 56f 56g 56h 56i 56 107 18 19 21 2 20 22 54 53 23 33 36 39 36 38 40 40 41 42 43 44 45 46 47 48 35 34 34 24 30 31 32 51 52 49 50 55 Appendix...

Страница 91: ...74 75 76 77 57 61 69 67 68 66 8 70 4 63 64 65 63 63 83 84 82 81 80 79 78 99 89 86 87 88 90 91 92 85 93 94 95 98 97 96 7 8 5 2 2 5 2 2 1714RSS 1705DWK 2 2200DGM 2200DGS 58 59 59 62 3 60 2 Appendix E S...

Страница 92: ...92 1700BLK 101 102 103 100 1700SWK 3 2 1 5 6 7 8 9 10 11 4 104 105 106 Appendix E Spare Parts...

Отзывы: