
3
Steel Framing Kit
Installation
3. Place one of the side panels (both sides are identical)
on top of the assembly and screw together (12
screws,
fi
lling indicated available holes).
4. Flip assembly over and place other side panel on top
of the assembly. Screw together (12 screws).
5. Remove
the
fi
rst 4 screws from Step 2. This will allow
proper connection of the middle section to the wall.
6. Put the
fi
nished middle section aside.
Install SFK and Fireplace
1. Place left hand
stud (
cut to
planned installa-
tion height
, not
included) vertically
and
fl
at against
wall. Level and
attach to stud
behind wall. Screw
every foot to
planned height.
Suggested #10 x
3-1/2” general pur-
pose wood screws,
not included.
2. Use middle sec-
tion on ground as
a guide for placing
right hand stud.
Screw middle sec-
tion to left stud,
snug to wall (this is
temporary). Sug-
gested #8 x 1-1/2”
general purpose
wood screws, not
included.
3. Check square of
middle section
against wall.
90°