background image

Installation manual 

1 General information 

 Dear client, 

We are glad that you have decided in favour of our garden house! 

Please read the assembly manual carefully before proceeding with the house installation!

 You 

will thus avoid problems and will not waste time.  

Recommendations: 

Keep the house package until its complete assembly in a dry place, but not in direct contact with
the ground, protected from weather conditions (moisture, the sun, etc.). Do not keep the house
package in a heated room!

When selecting the garden house location, make sure that the house will not be subjected to
extreme weather conditions (areas of strong snowfall or winds); otherwise you should attach the
house (for instance, with anchors) to the subsoil.

 Warranty 

Your house is made from high quality fir and delivered in the natural (unprocessed) form. If, despite 
our thorough inspection, you should have complaints, please submit the filled out control sheet and 
purchase invoice to the product seller.  

ATTENTION: Please be sure to keep the documentation accompanying the house package! The 
control sheet includes the control number of the house. We can only review complaints if you 
submit the control number of the house to the seller! 

The warranty does not cover: 

Peculiarities of wood as a natural material

Wooden details already painted (processed with a wood preservative)

Wooden details containing whole branches that do not endanger the stability of the house

Colour tone variations caused by wood structure differences that do not influence wood lifetime

Wooden details containing (caused by drying) small cracks/gaps that do not pass through and do
not influence the structure of the house

Twisted wooden details if they can nevertheless be installed

Roof and floor boards that may have on their concealed surfaces some non-planed areas, colour
differences and waning

Complaints resulting from an incompetent manner of the installation of the house or the house
subsiding due to an incompetently made foundation

Complaints caused by introducing self-initiative changes to the house, such as the deformation of
wooden details and doors/windows due to an incompetent manner of wood processing; the
attachment of storm braces too rigidly, doorframes being screwed onto wall logs, etc.

The complaints covered by the warranty are satisfied to the extent of replacing the 
deficient/faulty material. All other demands will be excluded! 

Содержание WISCONSIN 1

Страница 1: ...l prodotto Reservado el derecho a modificaciones t cnicas Produsent forbeholder seg retten til endre tekniske egenskaper ved produktet Alle rechten en technische wijzigingen voorbehouden V robce si vy...

Страница 2: ...f the house We can only review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already pai...

Страница 3: ...windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusi...

Страница 4: ...At the same time make sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete...

Страница 5: ...rresponding materials are not included in the supplied kit Installation of foundation joists Walls When installing the walls it is important to remember that The logs are always assembled with their t...

Страница 6: ...eaves on the hinges now To open and close the door fit the separately packaged lock and handle Window installation Continue with the installation of the wall logs until you reach the window height The...

Страница 7: ...r plane the apex or sidewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the ro...

Страница 8: ...with the supplied felt nails at intervals of about 15 cm Make sure that the felt strips overlap by at least 10 cm Having installed the roof cover material attach the wind braces to the roof and the fa...

Страница 9: ...ry shorten the upper ends of the slats Do not turn the screws tightly so wood can further swell or diminish With the house having settled you should adjust the attachments so the wall logs can settle...

Страница 10: ......

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Отзывы: