Valcom VL530-IC Скачать руководство пользователя страница 2

 

                                                                              2   

947477 

 

INSTALLATION

   

Mounting 

The VL530-IC message display must be mounted 
with appropriate hardware (not included). 
 
It is recommended to secure the mounting brackets 
to wall studs or other appropriate support.  If 
necessary, the spacing of the mounting brackets on 
the back of the message display may be adjusted to 
match stud spacing.  Loosen the nuts that attach 
the brackets to the display panel.  Slide the 
mounting bracket to the desired position and 
retighten the nuts. 
 
Remove the angle adjustment screws and nuts 
from the mounting bracket to gain access to the 
"keyhole" slots. (Figure 1) 
Mark the mounting holes on the wall and install 
appropriate hardware.  For stud walls, a minimum 
#10 x 2" screw is recommended. (Figure 2) 
Reinstall the angle adjustment screws and nuts 
previously removed. 

Hang the message display by the "keyhole" slots. 
(Figure 2) 
 
Secure the message display brackets to the wall 
with another screw at the top of each mounting 
bracket. (Figure 3) 
 

Network Connection / Power 

The VL530-IC has one RJ-45 network connector on 
the rear panel.  Connect a standard patch cable to 
the VL530-IC from an Ethernet switch supporting 
the Power over Ethernet Plus specification 802.3at 
(PoE+).   If a PoE+ switch is not available, a mid-
span injector may be used to supply power to the 
display. 
 

Setup

  

The VL530-IC will automatically acquire an IP 
address (using DHCP) and connect to the 
InformaCast server when connected to the network 
and powered up.  Information specific to your 
application will need to be programmed into the 
InformaCast server. Refer to the InformaCast 
documentation for further information. 

Отзывы: