V A L A V I O N I C S L T D
C O M 2 0 0 0 – V H F T R A N S C E I V E R
I N S T A L L A T I O N A N D O P E R A T O R ’ S M A N U A L
Revision 3
Page 10 of 31
March 2013
2.4.1
Operational Check
Refer to section three of this manual. Check all functions of the COM 2000 for proper operation. Check the
operational functions of other equipment installed in the aircraft in accordance with the individual manufacture’s
operation manuals to insure that no cross interference exists as a result of this installation.
2.4.2
Final Inspection
Verify that the wiring is bundled away from all controls and that no part of the installation interferes with the
movement of the aircraft controls. Move all of the aircraft controls through their full range of movement while
visually verifying that the installation does not mechanically interfere with the control movement. Verify that the
wiring harnesses are properly secured to the aircraft structure in accordance with accepted practices as described in
AC 43.13 and that adequate strain relief and service loops have been provided. Ensure that there are no kinks or
sharp bends in the wire harnesses. Verify that the wire bundles are not exposed to any sharp or abrasive surfaces.
Complete log book entries, FAA form 337, weight and balance computations and other documentations as required.
2.5
LIMITATIONS
There are no known limitations to the operation of the COM 2000. Instructions for Continued Airworthiness and
Return to Service Instructions can be found in Appendix C.