Test Procedure
1. Enter the TTY setups through
dspx
.
2. Issue the
V
command to display the internal status.
Checklist
Table 91 Internal Status Setup Checklist
Task
Checked OK/Not OK
Remarks
Test procedure completed successfully.
Status information is correct and shows no faults.
See
5.1.2 V and Vz – View Card and System Status (page 89)
Test Passed
For Customer
Date:
For Vaisala
Date:
A.7 Checking Board Configuration with
Setup
Mc
Command
Test Goal
Verify that the TTY setups for the Board Configuration section are properly configured for
the customer application.
Test Equipment
KVM installed
Test Procedure
1. Enter the TTY setups through
dspx
.
2. Issue the
Mc
command to display the internal status.
3. Set all the values, as required, for your operation.
Checklist
Table 92 Board Configuration Checklist
Task
Checked OK/Not OK
Remarks
Test procedure completed successfully.
Appendix A – Installation and Test Procedures
345
Содержание RVP900
Страница 1: ...M211322EN J User Guide RVP900 Digital Receiver and Signal Processor RVP900...
Страница 19: ...RVP9IFD China RoHS Compliance RVP901 AC and RCP903 China RoHS Compliance Chapter 2 Product Overview 17...
Страница 22: ...RVP900 User Guide M211322EN J 20...
Страница 88: ...RVP900 User Guide M211322EN J 86...
Страница 170: ...RVP900 User Guide M211322EN J 168...
Страница 236: ...RVP900 User Guide M211322EN J 234...
Страница 390: ...RVP900 User Guide M211322EN J 388...
Страница 434: ...Figure 68 ASR9 WSP with RVP7 Architecture RVP900 User Guide M211322EN J 432...
Страница 456: ...Figure 82 J90 to J111 Wiring Diagrams RVP900 User Guide M211322EN J 454...
Страница 457: ...Figure 83 J13 Wiring Diagram Appendix H TDWR Customizations 455...
Страница 468: ...RVP900 User Guide M211322EN J 466...
Страница 482: ...RVP900 User Guide M211322EN J 480...
Страница 483: ......
Страница 484: ...www vaisala com...