background image

Installation and maintenance manual ecoMAX 646

6

2 Safety instructions

Safety instructions and regulations

2.1 Safety 

instructions

2.1.1 

Installing and setting the appliance

 Important!

The appliance must be installed and serviced by 
a competent person as stated in the Gas Safety 
(Installation and Use) Regulations 1998. In IE, 
the installation must be in accordance with the 
current edition of IS 813 ‚Domestic Gas Instal-
lations‘, the current Building Regulations and 
reference should be made to the current ETCI 
rules for electrical installation.

2.1.2 Smell 

of 

gas

If you smell gas, the following safety instructions should 
be observed:
•  don‘t switch on any electrical switch in the danger area,
•  don‘t smoke in the danger area,
•  don‘t use a telephone in the danger area,
•  close the gas stop cock,
•  air the danger area,
•  notify a gas supplier or recognised gas fitting company.

2.1.3 

Changes to the surroundings of the boiler

No changes must be made to the following devices:
– the boiler
– the gas, air, water and electricity supply pipes
– the exhaust pipe
– the discharge pipe and the safety valve for the hot 

water

– the constructional conditions that could affect the 

operational reliability of the device.

2.1.4 

Important instructions for propane appliances

Bleeding the liquid gas tank when installing the system: 
before installing the device, make sure that the gas tank 
has been bled. The liquid gas supplier is responsible for 
the proper bleeding of the tank. Ignition problems can 
be caused if the tank is not bled properly. In such cases, 
first contact the person in charge of filling the tank.

Affixing the tank sticker:

Affix the enclosed tank sticker (propane quality) on the 
tank where it is clearly visible or on the bottle cabinet, if 
possible close to the filler nozzle.

Installing underground:

When installing in underground places, the requirements 
of the TRF 1996 (technical rules for liquid gas) are to be 
observed. We recommend the use of an external sole-
noid valve.

Connection set for external solenoid valve:

Item no.: 306 253 or 306 248

 Danger!

Only propane in accordance with DIN 51622 
may be used.

 Important!

When tightening or slackening screwed connec-
tions always use suitable open-ended spanners 
(not pipe wrenches or extensions etc.). 
Incorrect use and/or unsuitable tools can lead 
to damage being caused (e.g. gas or water leak-
age)!

2.2 General 

requirements

2.2.1 

Preliminary remarks for roomsealed appliances

This appliance should only be installed in conjunction 
with either a Vaillant flue system or an alternative ap-
proved system (details of flue approval categories can be 
found in the technical section of the installation manual).
Install the flue system as detailed in the separate flue in-
stallation instructions supplied with this boiler.

2.2.2 Related 

documents

The installation of the boiler must be in accordance with 
the relevant requirements of Gas Safety (Installation 
and Use) Regulations 1998, Health and Safety Document 
No. 635 (The Electricity at Work Regulations 1989), 
BS7671 (IEE Wiring Regulations) and the Water Supply 
(Water Fitting) Regulations 1999, or The Water Bylaws 
2000 (Scotland). It should also be in accordance with 
the relevant requirements of the Local Authority, Build-
ing Regulations, The Building Regulations (Scotland). 
The Building Regulations (Northern Ireland) and the 
relevant recommendations of the following British 
Standards:
BS 6700:  Services supplying water for domestic use 

within buildings and their curtilages.

BS 6798:  Specification for installation of gas fired boil-

ers not exceeding 60 kW input.

BS 6891:   Specification for installation of low pressure 

gas pipework up to 28 mm (R1) in domestic 
premises (2nd family gas).

BS 7593:   Treatment of water in domestic hot water cen-

tral heating systems. Institute of Gas Engi-
neers Publication IGE/UP/7/1998: ”Guide for 
gas installations in timber framed housing”

BS. 5482  Pt. 1 Domestic butane and propane gas burn-

ing installations.

IGE/UP1  

Soundness testing and purging of industrial 
and commercial gas installation.

IGE/UP2  

Gas installation pipework, boosters and com-
pressors on industrial and commercial premises.

IGE/UP10  Installation of gas appliances in industrial and 

commercial premises.

BS. 6644  Installation of gas fired hot water boilers of 

rated inputs between 60 kW and 2 MW (2nd 
and 3rd family gases).

Содержание ecoMAX 646

Страница 1: ...Installation and maintenance manual ecoMAX ecoMAX 646 For the installer Wall hung room sealed fan assisted condensing boiler GB...

Страница 2: ...Water circulation system 18 5 1 1 Treating the heating water 18 5 1 2 Heating side filling and bleeding 18 5 1 3 Hot water side filling and bleeding 19 5 1 4 Filling the siphon 19 5 2 Checking the gas...

Страница 3: ...list No 00 20 02 01 60 Sticker with name of appliance No 83 42 24 Installation template No 12 41 82 Safety sticker No 83 55 93 Service aids The following test and measuring equipment is required for i...

Страница 4: ...cription of the appliance 1 1 Design 1 2 3 4 7 8 9 10 11 5 6 Fig 1 1 Function elements 1 Connection for the flue pipe 2 Heat exchanger 3 Pressure switch 4 Pump 5 Electronics box 6 KFE cock 7 Air separ...

Страница 5: ...bility Coun cil Directive 89 336 EEC The appliances meet the basic requirements of the efficiency requirements directive Council Directive 92 42 EEC The appliances meet the basic requirements of the e...

Страница 6: ...nly propane in accordance with DIN 51622 may be used Important When tightening or slackening screwed connec tions always use suitable open ended spanners not pipe wrenches or extensions etc Incorrect...

Страница 7: ...ation of a boiler in a room containing a bath or shower Note Where a room sealed boiler is installed in a room containing a bath or shower any electrical switch or boiler control utilising mains elect...

Страница 8: ...the appliance Caution Do not install the appliance in rooms prone to frost In rooms with aggressive steam or dust the appliance must be operated independently of the ventilation When choosing the plac...

Страница 9: ...1 180 4 94 1 A 80 125 6 Fig 3 2 Connection dimensions 1 Flue connection 80 125 mm Dimension A with 87 elbow 253 mm Dimension A with 87 T piece 270 mm 2 Appliance holder 3 Heating return 4 Charging ci...

Страница 10: ...above with the bracket 3 Mount the cable connections to the appliance making sure they are disconnected from the power supply 85 50 240 75 75 23 50 3 1 2 Fig 3 4 Mounting the appliance 3 6 Removing A...

Страница 11: ...rams are schematic diagrams They do not replace the full profes sional diagrams The system diagrams do not contain the shut off devices and safety devices necessary for correct mounting Observe the ap...

Страница 12: ...0 K 15 K 20 K ecoMAX 646 WH 95 WH 40 WH 40 double cascade WH 160 WH 95 WH 95 triple cascade WH 280 WH 160 WH 160 quadruple cascade WH 280 WH 160 WH 160 Table 4 2 Selection of the hydraulic switch WH m...

Страница 13: ...4 5 Heating side connection Caution Ensure the connecting cables are disconnected from the power supply when mounting them so that no leaks are caused in the heating system The appliance is connected...

Страница 14: ...ch off the power sup ply to the boiler first Only once this is done may you carry out the installation There is continuous operating voltage at the power supply terminals L and N even when the main sw...

Страница 15: ...uous pump for VRC MF TEC or the multicircuit controller increase the pump run out time to 15 20 minutes diagnosis point d 1 see chapter 6 2 4 8 3 Connecting accessories and external system components...

Страница 16: ...g 20 V remove bridge on connection Room thermostat 24 V connections 7 8 and 9 Caution Do not connect supply voltage Risk of electronics being destroyed Mains supply 230 V 50 Hz Room thermostat 230 V 5...

Страница 17: ...red X 2 10 white X 2 15 blue X 2 8 black X 2 20 black X 4 X 10 X 7 X 6 X 2 X 2 9 red 22 VDC X 2 24 blue earth X 2 12 blue earth X 2 7 grey PWM X 2 3 black hall signal X 2 17 red 22 VDC X 2 23 black ea...

Страница 18: ...6015000 5 1 1 Treating the heating water Caution Do not enrich the heating water with frost or corrosion protection fluid If you enrich the heating water with frost or corrosion protection fluid chang...

Страница 19: ...the gas setting 5 2 1 Factory gas setting Caution Before starting up the appliance compare the data on the set gas type on the data badge with the gas on site Checking the amount of gas is not necessa...

Страница 20: ...t correct the error notify the gas supplier Proceed as follows Put the appliance out of operation Close the appliance s gas stop cock Remove the pressure gauge and screw the seal plug 1 fig 5 3 back...

Страница 21: ...h m3 Table 5 2 Factory gas setting 5 3 Functional test After installing the appliance and setting the gas per form a functional test before commissioning the appli ance and handing it over to the user...

Страница 22: ...tem Instruct the user about the methods used for combus tion air supply and flue conducting Be especially sure to point out that these must not be altered Instruct the user on how to check the require...

Страница 23: ...the display Then the set par tial load is displayed in kW By pressing the or keys you can now increase or decrease the value in 1 kW increments The displayed value flashes during the setting proce dur...

Страница 24: ...activated for a certain time after every time it has been switched off The burner lockout time can be adjusted to fit the characteristics of the heating system The burner lockout time is only activat...

Страница 25: ...t be required are listed in the relevant current spare parts catalogues Information can be obtained from Vaillant Customer Service Centres Note If inspection and maintenance work is neces sary with th...

Страница 26: ...burner may not be opened It can only be guar anteed that this component is gas tight after it has been inspected at the factory Cut off the gas supply to the appliance Lower the switch cabinet Undo t...

Страница 27: ...burner is maintenance free and needs no cleaning The surface should be checked for damage and the burner replaced if necessary After checking replacing the burner install the com pact thermo module as...

Страница 28: ...hose to a suitable discharge point Make sure that the boiler s maintenance cocks are open Open the draining cock Open the air release valves on the radiators Start with the radiator that is highest u...

Страница 29: ...ing S 0 No heat required S 1 Heating pump supply S 2 Heating fan start S 3 Heating ignition S 4 Heating burner on S 5 S 6 Heating fan run out S 7 Heating pump run out S 8 Remaining lockout time heatin...

Страница 30: ...ontrol d 22 Hot water request 1 on 0 off d 23 Operating mode summer winter mode 1 on 0 off d 24 Air pressure sensor actual value actual value in Pa d 25 Hot water enabling via warm restart clock 1 yes...

Страница 31: ...program F 24 Water shortage Temperature rise too quick System not bled correcly pump jammed reduced output of the pump air in the appliance system pressure too low supply and return NTC mixed up start...

Страница 32: ...Test programs 9 Vaillant Service To ensure regular servicing it is strongly recommended that arrangements are made for a Maintenance Agree ment Please contact Vaillant Service Solutions 0870 6060 777...

Страница 33: ...pressure natural gas p 20 mbar connection pressure gas flow pressure propane p 50 mbar flue gas mass flow min max 5 7 20 5 g s flue gas temperature min max 40 70 C rated water volume when T 20 K 1935...

Страница 34: ......

Страница 35: ......

Страница 36: ...0020020158_00GB 03 2006 Subject to alteration...

Отзывы: