![Vaillant ecoFIT sustain 825 Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/vaillant/ecofit-sustain-825/ecofit-sustain-825_installation-and-maintenance-instructions-manual_4100072028.webp)
12 Decommissioning the product
28
Installation and maintenance instructions ecoFIT sustain 0020230529_04
11.13 Draining the product
1.
Close the service valves of the product.
2.
Start check programme
P.05
.
Overview of the check programmes (
3.
Open the drain valves.
11.14 Checking the admission pressure of the
expansion vessel
1.
Drain the product. (
2.
Measure the pre-charge pressure of the expansion ves-
sel at the vessel valve.
Condition
: Pre-charge pressure < 0.075 MPa (0.75 bar)
▶
Top up the expansion vessel in accordance with the
static height of the heating installation, ideally with ni-
trogen, otherwise with air. Ensure that the drain valve is
open when topping up.
3.
If water escapes from the valve of the expansion
vessel, you must replace the expansion vessel
4.
Fill and purge the heating installation. (
11.15 Completing inspection and maintenance
work
12 Decommissioning the product
▶
Switch off the product.
▶
Disconnect the product from the electrical installation.
▶
Close the gas stopcock.
▶
Close the cold-water isolation valve.
▶
Drain the product. (
13 Customer service
To ensure regular servicing, it is strongly recommended
that arrangements are made for a Maintenance Agreement.
Please contact Vaillant Service Solutions for further details:
Telephone: 0330
100
3461
14 Recycling and disposal
Disposing of the packaging
▶
Dispose of the packaging correctly.
▶
Observe all relevant regulations.
▶
Check the gas flow
pressure.
(→ Page 18)
▶
Check the CO
₂
content. (→ Page 19)
▶
If required, res
et the maintenance interval.
(→ Page 38)
▶
Check that the product is leak-tight. (→ Page 19)
▶
Install the front casing.
▶
Fill out the relevant Service Record section in the
Benchmark Checklist
located in the rear
of this
document.