On-roof fitting and installation 4
0020100571_03 auroTHERM, auroTHERM plus Installation manual
21
4.3.2
Checking the installation
Use the following checklist to ensure that all work steps have been performed.
Note
After initial start-up, and in seasons with significant ambient temperature fluctuations, condensate may form in the
collector. This is normal.
Note
Reflections caused by irregularities of the glass are typical of the material.
Operations
Yes
No
Comments
All hydraulic connections secured with clamps
☐
☐
Hydraulic connections routed correctly
☐
☐
Collector sensor
VR 11
connected
☐
☐
All clamping elements tightened
☐
☐
Collectors connected to lightning protection device
(Optionally for lightning protection device)
☐
☐
Pressure testing performed
(Ideally with compressed air)
☐
☐
All connections tight
☐
☐
Date
Signature
All installation work has been
performed correctly.
ˍ ˍ
.
ˍ ˍ
.
ˍ ˍ ˍ ˍ