Installation 5
0020221298_04 auroSTOR Installation and maintenance instructions
7
4.3
Unpacking the product
1.
Remove the product from its box.
2.
Remove the protective film from all of the product's
components.
4.4
Checking the scope of delivery
1
2
3
4
5
6
7
▶
Check that the scope of delivery is complete.
Refer-
ence
point
Quant-
ity
Designation
1
1
Enclosed documentation
2
1
Tundish with retainer
3
1
2-port motorised valve
4
1
Safety group
5
1
Expansion vessel
6
1
Bag with accessories
7
1
Domestic hot water cylinder and temper-
ature and pressure relief valve
4.5
Product dimensions
Ø 595
638
90°
379
317
265
154
B
A
D
C
E
F
Dimensions (mm)
VIH S GB
200/3 BES
VIH S GB
250/3 BES
VIH S GB
300/3 BES
A
1,265
1,535
1,745
B
940
1,210
1,421
C
890
1,090
1,271
D
764
914
995
E
702
852
933
F
650
800
881
5
Installation
5.1
Setting up the unit horizontally
▶
Align the product vertically by adjusting the adjustable
feet.
5.2
Hydraulic connection
Caution.
Risk of damage caused by heat transfer
when welding.
The heat that is transferred during welding
may damage the cylinder and its components
as well as the connection seals.
▶
Protect the product and its components.
▶
Do not weld the connection pieces if these
have been screwed into the pipe fittings.