background image

6 Start-up

14

Installation and maintenance instructions auroSTOR 0020221298_04

5.3.9

Connecting the 2-port motorised valve to the
power supply

Connect the 2-port motorised valve; to do this, see the
instructions for the control or multi-functional module.

6

Start-up

6.1

Setting the immersion heater thermostat

70

60 50

40

1

3

2

4

1

The domestic hot water temperature is controlled via the
immersion heater thermostat

(1)

.

Condition

: Without a multi-functional module or control

Set the domestic hot water temperature as desired.

Condition

: With multi-functional module or control

Set the immersion heater thermostat

(1)

to its maximum.

The temperature of the immersion heater is regulated via
the temperature sensor that is installed on the carrier in the
electronics box.

6.2

Cold water inlet pressure

The product's efficiency depends on the cold water inlet
pressure.

To achieve optimum efficiency, we recommend a pressure of
at least 2 bar.

6.3

Setting the thermostatic mixing valve

During initial start-up, set the maximum value.

6.4

Filling and purging the product

Note

It is not permitted to use valves or expansion relief
valves for the purging.

1.

Check whether the drain valve is closed.

2.

Open the domestic hot water draw-off valves.

3.

Open the water supply valve.

4.

Open the manual air separator at the top of the cylinder.

5.

Let the water flow in order to remove any air bubbles.

6.

Close the manual air separator as soon as all of the air
has escaped.

7.

Close the domestic hot water draw-off valves.

8.

Check whether there are any leaks. Check the immer-
sion heater in particular.

9.

Open the highest hot water supply valve, and then the
lowest hot water supply valve, and let the water flow.

Water running time:

5 min

10. Close all of the draw-off valves.

6.5

Filling and purging the heating circuit

Note

The heating circuit can be filled using a filling
device or a separate filling tap, which is installed
at a location that is easily accessible.

The separate filling tap must be removed after
filling.

If a filling device is used, close the filling valve and
remove the filling device.

If you are not permitted to use a separate filling
tap due to legal provisions, use a pump.

1.

Move the lever on the 2-port motorised valve to MAN
OPEN and hold it in this position.

2.

Flush out the heating circuit and then fill and purge it.
Consult the installation instructions for the heat gener-
ator.

3.

Move the lever to AUTO.

4.

Remove the cover for the electrics.

5.

Set the product's thermostat and the immersion heater's
thermostat.

Setting the thermostats: 60

6.

Start up the heat generator.

7.

Drain the heating circuit as soon as the operating
temperature has been reached in order to remove any
residue from the heating installation.

8.

Fill and purge the heating circuit. Consult the installation
instructions for the heat generator.

6.6

Filling and purging the solar circuit

Consult the solar installation instructions.

7

Handing the product over to the end
user

Once the installation is complete, show the user the loca-
tion and function of the safety devices.

Inform the end user how to handle the product.

In particular, draw attention to the safety warnings which
the end user must follow.

Inform the end user of the necessity to have the product
maintained according to the specified intervals.

Содержание auroSTOR VIH S GB 200/3 BES

Страница 1: ...lation and maintenance instructions auroSTOR VIH S GB 3 BES GB IE Publisher manufacturer Vaillant GmbH Berghauser Str 40 D 42859 Remscheid Tel 492191 18 0 Fax 492191 18 2810 info vaillant de www vaill...

Страница 2: ...unit horizontally 7 5 2 Hydraulic connection 7 5 3 Electrical installation 11 6 Start up 14 6 1 Setting the immersion heater thermostat 14 6 2 Cold water inlet pressure 14 6 3 Setting the thermostati...

Страница 3: ...tenance instructions for the product and any other system com ponents installing and setting up the product in ac cordance with the product and system ap proval compliance with all inspection and main...

Страница 4: ...orrect tool 1 4 5 Risk of material damage caused by frost Do not install the product in rooms prone to frost 1 4 6 Risk of injury due to the heavy weight of the product Make sure that the product is t...

Страница 5: ...appropriate Building Regu lations The Benchmark Checklist can be used to demon strate compliance with Building Regulations and should be provided to the customer for future reference Installers are re...

Страница 6: ...tion area Select a sensible installation site and take into consideration the routing of the pipework system Install the cylinder as close as possible to the heat generator in order to minimise heat l...

Страница 7: ...and temper ature and pressure relief valve 4 5 Product dimensions 595 638 90 379 317 265 154 B A D C E F Dimensions mm VIH S GB 200 3 BES VIH S GB 250 3 BES VIH S GB 300 3 BES A 1 265 1 535 1 745 B 9...

Страница 8: ...and the outlet 2 Installing the solar yield sensor 2 Install the yield sensor on the solar coil outlet close to the cylinder 5 2 2 Connecting the product to the heating circuit 1 Connect the heating c...

Страница 9: ...tall the expansion vessel close to the product 2 Install a pipe at the expansion vessel and connect the terminal to the safety assembly 6 5 2 6 Installing a discharge pipe 600 mm 300 mm D2 2 1 D1 1 Te...

Страница 10: ...ontact with the waste water and provided that the sys tem is not visible Do not install any valves or stopcocks on the drain pipework Make sure that the discharge pipe from the tundish to the drain ha...

Страница 11: ...and N are live Switch off the power supply Secure the power supply against being switched back on Caution Risk of material damage by drilling through the product The product may be damaged by drilling...

Страница 12: ...pply 70 60 50 40 1 3 2 4 L N 1 L N 3 2 4 1 2 1 Remove the cover for the electrics on the cylinder 2 Install a separate power supply for the immersion heater in accordance with the applicable standards...

Страница 13: ...nctional module 5 3 7 Connecting the control Condition eBUS The thermal cut out for the primary circuit is not used when connecting an eBUS unit Condition 230 V control If you use a 230 V control from...

Страница 14: ...eck the immer sion heater in particular 9 Open the highest hot water supply valve and then the lowest hot water supply valve and let the water flow Water running time 5 min 10 Close all of the draw of...

Страница 15: ...draw off valve 2 Secure a hose to the drain valve 3 Position the hose at a suitable drain 4 Open the highest hot water tap in the installation 5 Open the drain valve and drain the product completely...

Страница 16: ...le 3 Reduce the temperature of the thermostat to 55 C 4 Replace the thermostat Irregular domestic hot water output at the valve 1 Defective expansion vessel 2 Thermal control 1 Set the expansion vesse...

Страница 17: ...16 0 kW 15 2 kW Flow rate 900 l h 900 l h 900 l h Pressure loss in the heat exchanger heating circuit 50 mbar 50 mbar 50 mbar Volume of the heat exchanger heating circuit 3 7 l 3 7 l 3 7 l Volume of...

Страница 18: ...z 230 240 V 50Hz 230 240 V 50Hz Thermostat 230 240 V 50Hz 230 240 V 50Hz 230 240 V 50Hz IP rating 21 21 21 Technical data Material VIH S GB 200 3 BES VIH S GB 250 3 BES VIH S GB 300 3 BES Cylinder mat...

Страница 19: ...Appendix 0020221298_04 auroSTOR Installation and maintenance instructions 19 D Commissioning Checklist...

Страница 20: ...UROV KDYH EHHQ WWHG LQ FRPSOLDQFH ZLWK 3DUW RI WKH XLOGLQJ 5HJXODWLRQV Yes Type of control system if applicable Y Plan S Plan Other Is the cylinder solar or other renewable compatible Yes No What is t...

Страница 21: ...Date Engineer name Company name Telephone No Comments Signature SERVICE 05 Date Engineer name Company name Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comm...

Страница 22: ...n valve 8 Draining the product 15 E Electricity 3 F Filling and purging the heating circuit 14 Filling and purging the product 14 Filling and purging the solar circuit 14 Frost 4 H Handing over to the...

Страница 23: ......

Страница 24: ...byshire DE56 1JT Telephone 0330 100 3461 info vaillant co uk www vaillant co uk These instructions or parts thereof are protected by copyright and may be reproduced or distributed only with the manufa...

Отзывы: