Vag 991-D Скачать руководство пользователя страница 3

 

 

 

START-UP 

The  valve  generally  does  not  require  any  calibration 
or  adjustment  prior  to start-up.    The counterweight(s) 
should be initially placed at the far end of the arm and 
secured by tightening the set screw (31A). 
 
The  valve  should  smoothly  swing  open  as  flow 
through the valve increases.  The amount of opening 
depends  on  the  flow  velocity  through  the  valve  and 
can  be  observed  by  watching  the 

external 

counterweight arm

.  The valve is “full ported” at about 

25 degrees of swing but can swing open as much as 
60 degrees.  
 

PREVENTIVE MAINTENANCE 

Figure  991  Vacuum  Breaking  Valves  require  no 
scheduled  lubrication,  adjustment  or  preventive 
maintenance. 
 
A monthly inspection should be performed for the first 
6  months  of  operation  to  ensure  the  valve  is 
functioning  properly  and  there  is  no  external  fluid 
leakage  or  audible  evidence  of  water  leaking 
backwards through the closed valve.   
 
Thereafter,  a  quarterly  visual  inspection  should  be 
performed. 

 
TROUBLESHOOTING 

 

Shaft packing leakage 

 

Tighten  packing  gland  nuts  equally  just 
enough to stop leakage, no more than ½ turn 
at  a  time.    DO  NOT  OVER-TIGHTEN! 
Replace packing if necessary. 

 

Leakage past seat when closed 

 

Inspect valve for debris, clean 

 

Inspect  seating  surfaces  for  damage,  replace 
as necessary 

 

Leakage past cover or flange gaskets 

 

Tighten cover or flange bolts 

 

WARNING 

Removing the valve from the line or disassembling 

the valve while there is pressure in the valve body 

may result in injury or damage to the valve 

 

WARNING 

Follow all applicable safety regulations and codes and 

read and understand all instructions before 

undertaking disassembly.  

 

 
DISASSEMBLY 

All Figure 991 valves can be serviced while the body 
remains  connected  to  the  pipeline.    A  skilled 
technician  should  perform  all  work.    No  special  tools 
are required.   
 
First ensure there is no pressure within the valve and 
operating equipment is tagged and locked out.   Refer 
to pages 3 and 4 for parts identification and location. 
 

It  is  not  necessary  to  disassemble  the  entire valve  to 
replace the shaft packing, follow steps 1 to 3 and 5a.  
 

1.  Ensure there is no pressure within the valve 

and operating equipment is locked out. 

2.  Mark  the  position  of the counterweight(s) on 

the  arm.    Loosen  the  counterweight  set 
screw  (31A)  and  slide  the  weight(s)  off  the 
arm.    Loosen  the  counterweight  arm  set 
screws  (30A)  and  slide  the  arm  (30)  off  the 
shaft, being careful not to lose the key (30B).  

3.  Loosen and remove the gland stud nuts (16), 

slide off the gland (15) and remove the shaft 
packing (17).   

4.  Remove  the  end  plate  bolts  (35),  the  end 

plate  (34)  being  careful  not  to  lose  or 
damage the end plate seal (36) unless it is to 
be replaced 

5.  Remove  the  cover  bolts  (10)  and  lift  off  the 

cover  (9).    If  necessary,  carefully  pry  the 
cover  off  using  a  cold  chisel  between  the 
body  and  cover.    Be  careful  not  to  damage 
or lose the cover gasket (8) unless it is to be 
replaced. 

6.  Remove  the  shaft lock  pin  (18)  by threading 

a screw into the tapped hole. 

7.  With  the  disc  and  disc  arm  properly 

supported,  loosen  the  disc  arm  set  screw 
(12)  and  pull  the  shaft  (11)  out  of  the  valve.  
It  may  be  necessary  to  drive  out  the  shaft 
from the opposite end.         
NOTE: The outer bushing (14) and disc arm 

key  (19)  should  come  out  with  the 
shaft.  Be careful not to lose the disc 
arm  key.    After  the  shaft  is  out, 
remove  the  inner  bushing  (13)  from 
the opposite side.    

8.  Carefully lift the disc arm assembly out of the 

body.  Remove the disc nut pin (6B), disc nut 
(6) and disc nut washer (6A). 

9.  Remove  the  seat  screws  (5C),  the  seat 

follower (5B) and the renewable seat (5A) or 
metal seat washer (5D). 

10.  In the unlikely event it

’s necessary to remove 

the  body  seat  (2),  the  spring  pins  holding  it 
into the body must be compressed until they 
no  longer  “bite”  into  the  body.    This  is  best 
accomplished  by  compressing  the  seat  pins 
(2B) using “vice-grips” and pulling the pins in 
a  radial  direction 

towards  the  valve 

centerline.      

 

Inspect  all  parts  for  wear  and  damage.    Replace 
damaged parts. 
 

ASSEMBLY 

The  valve  is  reassembled  by  reversing  the 
disassembly  sequence  with  consideration  of  the 
following: 
 

1a.  Clean  and  polish  all  machined  bearing  and 

sealing  surfaces.    Apply  a  light  coat  of 
lubricant to assist in the assembly. 

Отзывы: