VAF GV900W Скачать руководство пользователя страница 17

    VAF Adjustable Band Selective Repeater     

 

 

VAF Corp. 

Data Communication 

Tell:44655121 Fax: 44658496 

 

antenna while its coverage must be ensured. For isolation degree, the 
greater, the better. 

(2)

 

Selection of band 

Set to corresponding frequencies by using the monitoring and control 

software of the repeater. 

(3)

 

Field intensity test and level adjustment. 

Level adjustment is important in the opening of wireless transmission 

repeater construction, especially for downlink passage. First, test field 

intensity of the signal of the base by donor antenna and then adjust the 
uplink and downlink gains according to the field intensity of the signal so 

that the downlink output shall meet the requirements of coverage. 
Meanwhile, adjust corresponding uplink and downlink gains. 

(4)

 

Sealing of joints of feed lines:  

it is suggested that it should be powered up first and test the level to 

see if it is normal before the sealing of joints of feed line of antenna. 
Clean the joint’s inner part before installation of it, check and see if the 

length of cable core and their left or right position are correct and then 
fix them. Check if the joint is fastened before sealing. 

(5)

 

Lightning protections 

The location of wireless transmission repeater is usually in high 

buildings or at the top of mountain and is connected to the antenna by 
feed line. Thus it should have reliable lightning protection. The lightning 

protections of wireless transmission repeater include the followings: 

ƒ

 

Cases, antenna bases and cables must be reliably grounded. 

ƒ

 

Inlet power cables must be protected against lightning. 

ƒ

 

The lightning protection of antenna. 

(6)

 

Grounding of Equipment 

Peel off the plastic skin of the feed line with special tools according to 

the requirements of the process and leave a 6 to 7cm cut. Do not hurt 
the inner ripple copper tube. Fasten it with copper braided tape to ensure 

Содержание GV900W

Страница 1: ...VAF Corp Data Communication Tell 44655121 Fax 44658496 GV900W Adjustable Band Selective Repeater User Manual Version 1 2 April 2007...

Страница 2: ...L SPECIFICATION 5 2 1 1 Major Blocks diagram 2 1 2 Theory of Operation 2 2 MAJOR TECHNICAL PERFORMANCES 6 3 INSTALLATION 8 3 1 SYSTEM DESCRIPTION 8 3 1 1 Structure and Internal module 8 3 1 2 Bottom p...

Страница 3: ...ge enhance network capacity reduce network cost and realize network optimization Wireless transmission repeater of GSM mobile communications is meant to amplify communication signal extend network cov...

Страница 4: ...munication technology and excellent performances provides operators with multiple solutions that can save the investment in equipment and running maintenance cost without lowering the network quality...

Страница 5: ...with low noise for the system proper linearity and high power 3 Ensure normal working of the repeater under tough environment with automatic level control ALC function 4 Modularized design facilitates...

Страница 6: ...ones at will When a monitoring center has been established technicians can control repeaters by OMT software in the monitoring center or optimize parameters and upgrade software according to the actua...

Страница 7: ...Theory of Operation The downlink signal received by the donor antenna of the base station shall be sent to a band selective filter via duplexer to be filtered and to be amplified by the downlink band...

Страница 8: ...3 dB No bigger 3 dB Frequency Error 5X10 8 5X10 8 Gain Adjustment Range No less 30dB No less 30dB 10 dB 1 0dB 20 dB 1 0dB Gain Adjustmen t Error 30 dB 1 5dB Gain Adjustment Step 1 dB Step 1 dB Step N...

Страница 9: ...magnetic compatibility In accordance with relevant regulations in the standard of GB6833 87 Environmental Conditions Temperature 25 c 55 c Humidity 95 Air pressure 70 106kPa Dimension W x D x H 360 x...

Страница 10: ...VAF Adjustable Band Selective Repeater VAF Corp Data Communication Tell 44655121 Fax 44658496 3 Installation 3 1 System description Fix part Heat sink...

Страница 11: ...a Communication Tell 44655121 Fax 44658496 3 1 1 Structure and Internal module 3 1 1 1 Power Amplifier 3 1 1 2 LNA Module 3 1 1 3 Filter 3 1 1 4 Duplexer 3 1 1 5 Channel Band Frequency Selective 3 1 1...

Страница 12: ...cation Tell 44655121 Fax 44658496 3 1 2 Bottom panel 3 1 3 Front panel POWER GSM900 RF REPEATERS ON OFF Power LCD Alarm Reset Enter Shift RS232 Control Key Up Down Right battery BS AC220V GND MS MODEM...

Страница 13: ...m DNP_37dBm Downlink Power now is 37 dBm range 0dBm 43dBm If there alarm will display at below such as DV WRONG etc Press Down keyboard will show below Item 1 1 Show status AC_220V current AC power vo...

Страница 14: ...actory password is 0000 Item 2 1 Parameter setting operator can edit through right and shift button when finished edit press return to confirm VER_2 setting Version FAC_0000 setting manufactory ID FIX...

Страница 15: ...ough right and shift button when finished edit press return to confirm UPSW_ON uplink stationary wave alarm enable DNSW_ON downlink stationary wave alarm enable POWER_ON power modular failure alarm en...

Страница 16: ...EY_0000 setting pass word Default factory pass word 0000 3 3 Preparations before Installation of the Equipment Following jobs should be done before installation of equipment Site reconnaissance and te...

Страница 17: ...be powered up first and test the level to see if it is normal before the sealing of joints of feed line of antenna Clean the joint s inner part before installation of it check and see if the length of...

Страница 18: ...k if the signal received by donor antenna and the signal amplitude agree with design plan Adjust the direction and angle of the antenna to achieve a maximum value of amplitude of the signal from base...

Страница 19: ...equipment without special need once the equipment is put to use Therefore the equipment must be used in ventilated and clean environment avoiding dust from entering the equipment consequently causing...

Страница 20: ...e product Check all the attached accessories by packing list upon reception of the equipment of our company Contact the supplier in time for any shortage Our company owns the property right of our pro...

Страница 21: ...4dB 1 1 1 0 0 25dB 0 1 1 0 0 26dB 1 0 1 0 0 27dB 0 0 1 0 0 28dB 1 1 0 0 0 29dB 0 1 0 0 0 30dB 1 0 0 0 0 31dB 0 0 0 0 0 2 Power Watt to dBm exchange table DBm watt dBm watt dBm watt dBm watt 0 0 001 16...

Страница 22: ...ope 1 to 1000 Step between two channel is 25K Hz Uplink channel define Channel N 890 000HZ N 0 025 M Hz Downlink channel define Channel M 935 000HZ M 0 025 M Hz example Channel 1 uplink is 890 1 0 025...

Страница 23: ......

Отзывы: