background image

  Important - please read

  General installation

  

2

  

7

  Installers/users notes

Please read these instructions carefully before starting installation and keep for future 
reference.

Remove all packaging and check the product for missing parts or damage before 
starting installation.

Any alterations made to this product and fittings may infringe water regulations and 
will invalidate the guarantee.

The installation must comply with all Local/National Water Supply Authority 
Regulations/Byelaws and Building and Plumbing (UK:BS6700) Regulations.

We strongly recommend that you use a qualified and registered plumber.

These fittings are mixing devices and therefore water supplies must be reasonably 
balanced.

Where connections are made to the mains cold water supply, WRC approved single 
check valves must be fitted to both hot and cold inlets. This is a stated requirement of 
Water Supply (Water Fittings) Regulations 1999 Schedule 2, Section 6 G15.13.2

Before making any inlet pipe connections, all supply pipes MUST be thoroughly 
flushed to remove debris. Failure to do so could result in damage or low flow from the 
mixer unit. Water Supply (Water Fittings) Regulations 1999 Schedule 2 Section 4 G13.1

The fitting of isolating valves to the inlet feeds is advised for ease of maintenance.

Please take great care when installing this mixer not to damage its surface.

Please note if installing in an enclosed environment, access should be left for servicing 
and maintenance. No costs relating to inadequate access can be accepted.

  Operating Specifications

Hot Water Supply Temperature:
Minimum: 10° C higher than the maximum required mixed temperature (advise 65° C) 
Maximum: 85° C
Minimum operating pressure 0.5 bar. 
Maximum operating pressure 5 bar

Содержание Victoriana

Страница 1: ...which is non transferable Vado will at its option repair or replace free of charge any product or replacement part found to be defective The guarantee does not extend to any consequential loss or damage After repair or replacement the relevant guarantee period will be calculated from the original date of purchase The relevant guarantee periods are 1 Twelve years on chrome finish products 2 Six yea...

Страница 2: ...proved single check valves must be fitted to both hot and cold inlets This is a stated requirement of Water Supply Water Fittings Regulations 1999 Schedule 2 Section 6 G15 13 2 Before making any inlet pipe connections all supply pipes MUST be thoroughly flushed to remove debris Failure to do so could result in damage or low flow from the mixer unit Water Supply Water Fittings Regulations 1999 Sche...

Страница 3: ...a soft damp cloth ONLY and advise strongly against the use of ALL cleaning products i e powders and liquids If the above instructions are not followed this will invalidate your guarantee in the event of a problem occurring 40 52mm 205mm 95mm 66 77mm 205mm VADO E NGLAN D E NGLAN D VADO Victoriana wall mounted basin mixer Victoriana handles Kensington handles 135mm 100mm 25mm 15mm 68mm 34mm ...

Страница 4: ...ll 3 x 30mm holes Slide the valve assembly through the holes from the back Screw the spout cover onto the spout and then into the centre hole of the valve Screw the valve covers over the valves and up to the wall surface screw on the inner cover slide the handle onto the splines and secure with the screw Screw on the cover Connect the water supply to the inlet pipes The hot water should be connect...