Important - please read
General installation
2
7
Installers/users notes
Please read these instructions carefully before starting installation and keep for future
reference.
Remove all packaging and check the product for missing parts or damage before
starting installation.
Any alterations made to this product and fittings may infringe water regulations and
will invalidate the guarantee.
The installation must comply with all Local/National Water Supply Authority
Regulations/Byelaws and Building and Plumbing (UK:BS6700) Regulations.
We strongly recommend that you use a qualified and registered plumber.
These fittings are mixing devices and therefore water supplies must be reasonably
balanced.
Where connections are made to the mains cold water supply, WRC approved single
check valves must be fitted to both hot and cold inlets. This is a stated requirement of
Water Supply (Water Fittings) Regulations 1999 Schedule 2, Section 6 G15.13.2
Before making any inlet pipe connections, all supply pipes MUST be thoroughly
flushed to remove debris. Failure to do so could result in damage or low flow from the
mixer unit. Water Supply (Water Fittings) Regulations 1999 Schedule 2 Section 4 G13.1
The fitting of isolating valves to the inlet feeds is advised for ease of maintenance.
Please take great care when installing this mixer not to damage its surface.
Please note if installing in an enclosed environment, access should be left for servicing
and maintenance. No costs relating to inadequate access can be accepted.
Operating Specifications
Hot Water Supply Temperature:
Minimum: 10° C higher than the maximum required mixed temperature (advise 65° C)
Maximum: 85° C
Minimum operating pressure 0.5 bar.
Maximum operating pressure 5 bar