background image

7

6

Installation

NOTE: For illustrative purposes only 

the 100 tap installation is shown.  

Please follow the same procedure to 

install the 100E tap. 

Before installing your new mixer, flush 

through the pipework to ensure removal 

of debris, turn off the water supply.
Place the seal in the slot on the 

underside of the mixer body.
Position the mixer on the basin. From 

the underside of the basin screw the 

two flexible pipes to the hot and cold 

connections in the mixer body, the hot 

should be to the front and the cold to 

the back, hand tighten only. 
Screw the two threaded rods into the 

body the short rod to the front and long 

at the back. Both rods are the same for 

the 100E.
Clip together the rubber and metal 

washers and slide over the rods, the 

rubber washer should be on top. Screw 

on the nuts and tighten to clamp the 

mixer to the basin.   

CAUTION:

 Do not over tighten the nuts 

as this may damage the basin.
Connect the water supply to the 

inlet pipes. The hot water should be 

connected to the front pipe and cold to 

the back.

60mm

 

Installation - Quick guide

 1

 2

 3

Max - 5 Bar

1

2

3

4

0 5

Min - 1 Bar

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

3

1

4

5

6

7

2

Rubber  

washer

Metal  

washer

Hot flexible 

hose (red)

Cold flexible 

hose (blue)

Seal

Threaded 

rods

Nuts

Отзывы: