8
9
Commissioning
The valve has been factory set under balanced pressures and hot water supply at 65°C.
When your specific operating conditions are significantly different from the above, the
temperature of the water may vary from the setting.
When the difference is too great, you can adjust the calibration of the valve to suit
individual requirements of the installation:
Note:
Mixed water temperature at terminal fitting should never exceed 46°C.
1. Check the temperature of the water being delivered from the outlet with a
thermometer.
Note:
temperature readings should be taken at normal flow rate after allowing for the
system to stabilise.
2. If the temperature is not 38°C (When the 38 is aligned with the temperature
indicator) proceed to reset the calibration as follows.
Remove the handle: Carefully prise out the cover, remove the screw and washer and
pull off the handle.
Ensure the step on the stop ring is located at 12 o'clock.
Do not remove the plastic stop ring. Turn the spline of the thermostatic valve clockwise
to decrease the temperature and anti-clockwise to increase the temperature until 38°C
is achieved at outlet.
Note:
the sensing part of the thermometer probe must be fully submerged in the water
that is to be tested.
Replace the handle making sure that the pin is against the step.
Once the handle has been attached ensure the temperature does not exceed 46°C when
turned entirely anti-clockwise.
Your valve setting is now commissioned.
Cover
Screw
Stop ring
Handle
Override
button
Valve splines
Step
Stop ring
Step
Temperature
indicator
Maintenance
We advise that the below is carried out annually as failure to do so may result in
invalidation of warranty.
Isolating the thermostatic valve
IMPORTANT:
Please see the below procedure for isolating the thermostatic valve.
1. Isolate the incoming hot and cold water to the valve.
2. Turn shower valve on (left handle) to check isolation, please ensure that your body/
hands are not under the flow of water as there is a potential for delivery of hot water.
3. Remove temperature control handle and temperature stop ring (essential).
4. With shower in the on position, replace temperature handle on thermostatic Valve
(ensure temp stop has been removed).
5. Turn temp handle fully anti clockwise until stop point is reached and can be turned no
further , please ensure that your body/hands are not under the flow of water as there is
potential for delivery of hot water if isolation has been unsuccessful.
6. Turn temperature handle fully clockwise until resistance is felt.
7. If there is no flow of water coming from the outlet during both points 5 and 6 isolation
has been successful, you may now remove and maintain the cartridge.
8. If at any of the above point’s water continues to flow please isolate at an alternative
point within the system for both hot and cold and repeat points 2-8.
Thermostatic cartridge
To clean the filters, you must first remove the cartridge from the housing.
Removing the Cartridge:
1. Check water has been isolated.
2. Remove the handle and stop ring.
3. Release the grub screw from underneath the valve and pull out the
thermostatic cartridge.
4. Clean filters by rinsing them under running water to remove any debris.
Cleaning instructions:
Our products are finished to the highest standard and due care needs to be taken to
ensure their looks are retained.
We recommend cleaning all products with a soft damp cloth ONLY and advise strongly
against the use of ALL cleaning products i.e. powders and liquids.
If the above instructions are not followed this will invalidate your guarantee in the event
of a problem occurring.
Continue on next page