8
9
Installation - Pop-up waste
Dissemble the pop-up waste and
reassemble onto the basin.
(see Fig 1)
Insert the vertical control rod
down through the hole in the back
of the mixer body.
Slide the bearing (lip nearest the
ball) over the short end of the
horizontal control rod, push into
the waste and clamp in position by
screwing on the ball joint retainer.
Do not over tighten.
Slide the control rod link onto the
vertical control rod and loosely
tighten.
Test the action of the pop-up
waste when satisfied with the
operation fully tighten the rod
link. Adjust the control rod link as
required. Adjust the height of the
plug as required
(see Fig 2)
.
Turn on the water supply and turn
the mixer on fully to flush through
any possible debris from the mixer.
Finally check all new connections
for leaks.
Adjust the stop
to the required
position
Plug adjustment
Vertical
control
rod
Horizontal
control rod
Ball joint
retainer
Bearing
Control
rod link
Plug
Plug
housing
Seal
Seal
Body
Fig 1
Fig 2
Operation
Lifting the mixer lever
upwards will increase the
flow of water.
Moving the mixer lever from
right to left will increase the
water temperature.
Moving the mixer lever from
left to right will decrease
the water temperature.
On
Cold
Hot
Operation pop-up waste
Pull the waste control rod up to close
the plug and fill the basin.
Push the waste control rod down to open
the plug and empty the basin.