![VADO AXCES METIZ Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/vado/axces-metiz/axces-metiz_installation-and-user-manual_3159340004.webp)
6
7
Installation
Before installing your new mixer, flush through the pipe work to ensure removal of
debris, turn off the water supply.
Prepare the wall with 2 flush ½” connectors at 150mm centres. Connect the water
supply to the inlet pipes. The hot water should be connected to the left hand pipe.
Using PTFE tape screw on the 2 offset connectors followed by the shroud.
Place a rubber filter/washer in each of the locking nuts on the valve and screw onto
the connectors, some adjustment can be made to the offset connectors to align the
centres and level up the valve.
Note:
The valve must be connected to rigid pipe work for support.
Installation - Shower hose
Shower handset and hose
(not supplied)
Place one of the rubber washers into the nut end of the hose and attach it to
the mixer outlet.
Place the second washer into the cone end of the hose and screw to the
handset.
Nut end
of hose
Rubber
washer
Shroud
Locking nuts
Rubber filter/washer
Shower hose
connection
Cold
Hot
Offset connector
Offset connector
½”
connector