6
7
Installation
Before installing your new mixer, flush through the pipe work to ensure removal of
debris, turn off the water supply.
Prepare the wall with 2 flush ½” connectors at 150mm centres. Connect the water
supply to the inlet pipes. The hot water should be connected to the left hand pipe.
Using PTFE tape screw on the 2 offset connectors followed by the shrouds.
Place a rubber washer in each of the locking nuts on the valve and screw onto the
connectors, some adjustment can be made to the offset connectors to align the
centres and level up the valve.
Note:
The valve must be connected to rigid pipe work for support.
4
7
5
6
Installation - Quick guide
Rubber
washer
Nut
Place a rubber washer into the nut end
of the hose and attach it to the mixer
outlet.
Control
handle
Offset connector
Shrouds
Locking nuts
Rubber washer
Shower hose
connection
Cold
Hot
Offset connector
½”
connector