6
Installation
Before installing your new mixer, flush through the pipe work to ensure removal of
debris, turn off the water supply.
Note:
Make sure that the valve is positioned to allow room for the riser rail to be
fitted later (see dimensions on page 5).
Prepare the wall with 2 flush ½” connectors at 150mm centres. Connect the
water supply to the inlet pipes. The hot water should be connected to the left hand
connecter and cold to the right.
Note:
The valve must be connected to rigid pipe work for support.
Using PTFE tape screw the offset connectors to the wall fittings followed by
the shrouds.
Screw the locking nuts of the valve onto the connectors, some adjustment can be
made to the offset connectors to align the centres and level up the valve.
7
Installation
You can adjust the height of the riser
to suit your requirements. This must
be done before installing the riser rail.
Carefully push the riser arm down into
the riser rail, being careful not to damage
the seals.
Make sure that the riser arm is pointing
towards you with the four grub screws at
the back.
The riser bracket can be adjusted by
sliding it up or down.
Make sure that the riser arm is in the
correct position and the bracket fits
against the wall.
Make sure that the riser is vertical and
mark around the wall bracket with a
pencil. Remove the riser from the wall
and the valve.
Riser arm
Push the riser onto the connection on
the top of the valve being careful not to
damage the O-rings.
When in the correct position, tighten
the four grub screws with the supplied
hex key to secure the riser rail to the
riser arm.
Riser rail
Riser rail
Riser arm
Riser rail
Riser bracket
Grub
screws
Hex key
Pencil
Shrouds
Locking nuts
Riser rail
connection
Cold
Hot
Offset connectors
½”
connectors
150mm
Shower hose
connection
Содержание AXCES BOKX AX-BOK-149T-RRK-CP
Страница 9: ...16 Notes 17 Notes...