background image

14

15

Maintenance

We advise that the below is carried out annually as failure to do so may result in 

invalidation of warranty.

Isolating the thermostatic valve
IMPORTANT:

 Please see the below procedure for isolating the thermostatic valve.

1. Isolate the incoming hot and cold water to the valve.
2. Turn shower valve on (left handle) to check isolation, please ensure that your body/

hands are not under the flow of water as there is a potential for delivery of hot water.
3. Remove temperature control handle and temperature stop ring (essential).
4. With shower in the on position, replace temperature handle on thermostatic Valve 

(ensure temp stop has been removed).
5. Turn temp handle fully anti clockwise until stop point is reached and can be turned no 

further , please ensure that your body/hands are not under the flow of water as there is 

potential for delivery of hot water if isolation has been unsuccessful.
6. Turn temperature handle fully clockwise until resistance is felt.  
7. If there is no flow of water coming from the outlet during both points 5 and 6 isolation 

has been successful, you may now remove and maintain the cartridge.
8. If at any of the above point’s water continues to flow please isolate at an alternative 

point within the system for both hot and cold and repeat points 2-8.

Thermostatic cartridge

To clean the filters, you must first remove the cartridge from the housing.
Removing the Cartridge: 

1. Check water has been isolated. 

2. Remove the handle and stop ring. 

3. Release the grub screw from underneath the valve and pull out the  

thermostatic cartridge. 

4. Clean filters by rinsing them under running water to remove any debris. 

Cleaning instructions:

Our products are finished to the highest standard and due care needs to be taken to 

ensure their looks are retained.
We recommend cleaning all products with a soft damp cloth ONLY and advise strongly 

against the use of ALL cleaning products i.e. powders and liquids.
If the above instructions are not followed this will invalidate your guarantee in the event 

of a problem occurring.

Maintenance

5. If there is limescale deposits then it is recommended to immerse the cartridge for a 

few minutes in 50% white v 50% hot water, brush the filters gently and then rinse 

under running water to clean all particles. If this is not effective, a replacement cartridge 

should be fitted. 

6. Before reassembling the cartridge, clean its housing with a wet cloth and grease the 

O-rings using a suitable silicone grease. 

7. Reassemble the cartridge into the body, then place the plastic stop ring onto the 

cartridge with the step at the 12 o’clock position. 

8. Turn on the water supply. 

9. Check the water temperature to ensure correct commissioning. 

See page 13 of this guide for commissioning. 

10. Ensure that the step on the stop ring is at 12 o’clock and replace the handle with 

the temperature override button also pointing at 12 o’clock being careful not to turn the 

spline of the valve.

Grub screw

Cover

Screw

Stop ring

Handle

Override 

button

Valve splines

Step

Stop ring

Step

Содержание AXCES AX-SIR-123T-RRK/B-CP

Страница 1: ...model AX SIR 123T RRK B CP Version 1 1 2 21 VADO Wedmore Road Cheddar Somerset England BS27 3EB tel 01934 744466 fax 01934 744345 www vado com sales vado com SHOWER COLUMN KEEP FOR FUTURE REFERENCE I...

Страница 2: ...of your local water supplier see the WRAS website www wras co uk for details or the Water Regulations Advisory Scheme by email info wras co uk or telephone 01495848454 Before making any inlet pipe co...

Страница 3: ...4 5 Contents of Packaging Handset Riser rail Wall bracket Shower hose with 2 washers Riser arm Shower head with washer Handset holder Dimensions 993 1403mm 837 1247mm 899mm 200mm 150mm 282mm...

Страница 4: ...e wall using appropriate fixings Repeat for the other easy fit bracket Position the valve making sure it is level and mark the position of the 2 screw holes in each easy fit bracket Temporarily screw...

Страница 5: ...around the wall bracket with a pencil Remove the riser from the wall and the valve Installation Wall bracket Screw Warning Please check for any hidden cables and pipes before drilling holes in the wal...

Страница 6: ...onto the riser arm Washer Hose Handset Installation Shower hose Washer Hose Shower head Riser arm Washer Operation Pushing down on this button will go beyond 38 C Shower head Spout or handset Cold Hot...

Страница 7: ...water being delivered from the outlet with a thermometer Note temperature readings should be taken at normal flow rate after allowing for the system to stabilise 2 If the temperature is not 38 C When...

Страница 8: ...Check water has been isolated 2 Remove the handle and stop ring 3 Release the grub screw from underneath the valve and pull out the thermostatic cartridge 4 Clean filters by rinsing them under running...

Страница 9: ...17 16 Notes Notes...

Страница 10: ...one to our aftersales team Registration must be completed within 6 months from date of purchase Under the extended guarantee period VADO will at its option offer to supply any replacement product or c...

Отзывы: