8
9
Installation - Pop-up waste
Dissemble the pop-up waste and
reassemble onto the basin.
Insert the vertical control rod (with
knob) down through the hole in the
back of the mixer body and screw
into the extension rod.
Unscrew the ball joint retainer
on the side of the pop-up waste
body. Insert the short end of the
horizontal control rod (with ball
joint) into the waste, slide on the
clamping washer and clamp in
position by refitting the ball joint
retainer. Do not over tighten.
Slide one end of the spring plate
onto the horizontal control rod,
followed by the link and finally
other end of the spring plate.
Slide the control rod link onto the
vertical control rod and loosely
tighten.
Test the action of the pop-up
waste and fully tighten the rod
link. Adjust the ball joint retainer
and control rod link as required.
Turn on the water supply and turn
the mixer on fully to flush through
any possible debris from the mixer.
Finally check all new connections
for leaks.
Operation
Cold
Hot
Operation pop-up waste
Pull the waste control rod up to close
the plug and fill the basin.
Push the waste control rod down to open
the plug and empty the basin.
Turning the handle clockwise will
increase the water temperature.
Turning the handle anti-clockwise will
decrease the water temperature.
Vertical
control rod
extension
Control
rod
Horizontal
control rod
Ball joint
retainer
Clamping
washer
Control
rod link
Plug
Plug
housing
Seal
Seal
Body