VADO ALTITUDE TAB-128/3WO-ALT-CP Скачать руководство пользователя страница 2

2

  

3

Please read these instructions carefully before starting installation and keep for  

future reference.
Remove all packaging and check the product for missing parts or damage before 

starting installation.
Any alterations made to this product and fittings may infringe water regulations and 

will invalidate the guarantee.
The installation must comply with all Local/National Water Supply Authority 

Regulations/Byelaws and Building and Plumbing Regulations.  

To be installed in accordance with BS EN806.
We strongly recommend that you use a qualified and registered plumber.

General installation

Operating Specifications

Important - please read

Operating Pressure

Minimum operating pressure

 0.2 bar

 

(

1 bar

 if used as a bath fill)

 

Maximum operating pressure

 5 bar

This fitting is a mixing device and therefore water supplies should be reasonably 

balanced.
When installed, the fitting must comply with the requirements of the Water Supply 

(Water Fittings) Regulations 1999 and Scottish Byelaws 2004. 

For further information, contact the Water Regulations department of your local water 

supplier (see the WRAS website www.wras.co.uk for details) or the Water Regulations 
Advisory Scheme by email (info

@

wras.co.uk) or telephone: 01495848454.

Before making any inlet pipe connections, all supply pipes MUST be thoroughly flushed 

to remove debris. Failure to do so could result in damage or low flow from the mixer 

unit.
The fitting of isolating valves to the inlet feeds is advised for ease of maintenance.
Please take great care when installing this mixer not to damage its surface.
Please note if installing in an enclosed environment, access should be left for servicing 

and maintenance. No costs relating to inadequate access can be accepted.

Contents of Packaging

Installation guide &  

User manual

3 handle, 3 outlet thermostatic 

shower valve

TAB-128/3WO-AL

T-CP

Keep for future reference

Installation Guide

ALTITUDE

WHERE

INSPIRATION

FLOWS

ALTITUDE

3 handle, 3 outlet thermos

tatic shower valv

e

15

 ye

ar g

uarante

e

User Guide
Keep for future 

reference

Cover plate with  

Handset holder and outlet

Valve with 

Mortar guard

Handles & Shrouds x 3

Содержание ALTITUDE TAB-128/3WO-ALT-CP

Страница 1: ...for future reference Installation Guide ALTITUDE where inspiration flows Vado Wedmore Road Cheddar Somerset England BS27 3EB tel 01934 744466 fax 01934 744345 aftersales vado com www vado com This in...

Страница 2: ...99 and Scottish Byelaws 2004 For further information contact the Water Regulations department of your local water supplier see the WRAS website www wras co uk for details or the Water Regulations Advi...

Страница 3: ...4 5 Contents of Packaging Shower hose with 2 washers Handset Hex key Rubber caps x 3 Adaptors to x 4 Dimensions 95mm 80mm 80mm 40mm 80mm 370mm 306mm 125 5mm 75 100mm...

Страница 4: ...6 7 Installation Quick guide 1 2 77mm 263mm 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 3 90mm Installation Quick guide 4 5 1 2 3...

Страница 5: ...8 9 Installation Quick guide Installation Quick guide 8 9 6 7 x 1 x 3 x 3...

Страница 6: ...all shown in minimum position Installation Flush pipe work thoroughly before fitting the valve Warning Please check for any hidden cables and pipes before drilling holes in the wall The valve must be...

Страница 7: ...sure the temperature handle is correctly located with the handle stop at 12 o clock see right Carefully slide the handle on the splines secure with the grub screw and insert rubber cap in hole Flow ha...

Страница 8: ...the calibration of the valve to suit individual requirements of the installation 1 Check the temperature of the water being delivered to the outlet with a thermometer when the handle is located at 12...

Отзывы: