![VADA VFB-J40 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/vada/vfb-j40/vfb-j40_installation-manual_3142312011.webp)
11
What you’ll need to supply:
Suction Pipe
(internal diameter
of 25mm or larger)
Discharge pipe
(internal diameter
of 25mm or larger)
Thread tape
Pump cover
Access to a 10A
outdoor power point
Pump slab
Inline strainer aka
Y strainer
Check valve
x2 Isolation valves
INSTALLATION
The residence must also have a Residual Current Device (RCD), also known as Electrical Leakage
Circuit Breaker (ELCB). This is a safety switch located in the Fuse Box.