background image

job site preparation 

RC SERIES

JOB SITE PREPARATION

TRANSPORT THE LIFTER

Always turn the fuel shutoff valve to the OFF position when 
transporting or storing the vacuum lifting system.
When transporting the lifter, always securely attach it to the 
cradle with the proper hardware.

NOTE: Never transport or store the lifter by setting the pad 

directly on the trailer or the ground. Damage to the seal may 

result.

PREPARATION OF THE LIFTER

CONNECT THE HYDRAULIC HOSES

We recommend the hydraulic hoses from the vacuum lifting 
system be connected to the hydraulic lines used for the 
bucket cylinder on the excavator.

NOTE: Always clean the area around the hydraulic fittings 

and connections of dirt and debris before connecting or 

disconnecting any hydraulic lines or components. Hydraulic 

rotators are sensitive to dirt and foreign debris and will be 

damaged if dirt is allowed in the hydraulic system.

The hydraulic hoses supplied are extra long to allow them to 
be connected to a wide variety of machines. Be sure to secure 
the extra hose so not to interfere with the rotator.

1.  There are flow control valves (Fig. 1-1, 1) installed on 

the hose fittings. There is a flow diagram embossed on 
the flow control valve which shows the direction of flow.

2.  If the diagram is illegible, there is usually an inverted 

dot next to the knob on the flow control valve. The dot 
goes toward the excavator and the knob will be toward 
the vacuum lifter.

Fig. 1-1 

3.  Make sure the hoses from the excavator are connected 

with the flow in the correct direction.

4.  Connect the hoses to the flow control valves. Do no 

over-tighten the fittings. Over-tightening will cause 
damage to the fittings.

5.  Route the hoses along the stick. Clamps are provided 

that can be tack-welded to the stick to route and 
support the hoses. When securing the hoses, allow 
ample slack for hose movement to avoid binding or 
pinching.

ATTACH TO THE EXCAVATOR

1.  Inspect the adaptor and pin to make sure the proper 

pin, bushings, and spacers are used.

2.  Inspect the adaptor, pin, bushings, and spacers to 

ensure proper fit.

3.  Attach the adaptor to the excavator arm using the pin 

(Fig. 1-2, 1). Use the correct spacers (Fig. 1-2, 2) to 
center the arm between the adaptor.

Fig. 1-2 

4.  Apply grease to the pin, where applicable, daily to 

ensure proper lift functions and smooth movement.

ADJUST ROTATION SPEED

Rotation speed should be slow to maintain control and 
operate the vacuum lifter safely. 
The flow control valves (Fig. 1-1, 1) on the hydraulic fittings 
are “one way open – other way restricted” type. They can be 
adjusted to increase or decrease the rotation speed.

1.  For initial start-up, turn the valves clockwise all the 

way to close them. To open the valves, turn them 
counterclockwise one complete turn. Make sure both 
valves are adjusted equally.

1

1

2

Содержание RC 10

Страница 1: ...VISIT VACUWORX COM TO DOWNLOAD COMPLETE OPERATION MANUAL...

Страница 2: ...y an inverted dot next to the knob on the flow control valve The dot goes toward the excavator and the knob will be toward the vacuum lifter Fig 1 1 3 Make sure the hoses from the excavator are connec...

Страница 3: ...Lift the pipe as close to the center as possible to keep the load balanced Marking the center of the pipe before lifting is safe and more efficient and can speed up the operation 2 Keep this setting...

Страница 4: ...gine speed Tampering with the engine speed will void the warranty on the engine and pump STARTING THE ENGINE GLOW PLUG ON KEY SWITCH 4 If the temperature is 40 F 4 C or below turn the engine starting...

Страница 5: ...g 1 5 2 for 1 2 seconds to create vacuum on the pad Monitor gauge until it reaches green area Then it is safe to lift the load 4 To release load hold top 2 circle shaped buttons Fig 1 5 4 simultaneous...

Страница 6: ...um when pad is not on material to be lifted If pad is not properly placed on material when vacuum is activated the vacuum in the reservoir might be lost Therefore watch the pad gauge when activating v...

Страница 7: ...the load SHUTDOWN AND STORAGE When finished the vacuum lifting system must be properly shut down and stored 1 If attached to excavator always store the lifter with the pad on material If detaching th...

Страница 8: ...PT1102 004 09 18 COPYRIGHT 2018 VACUWORX...

Отзывы: