background image

page 24 of 27

Documents are only to be used and distributed completely and unchanged. It is strictly the users´ responsibility to check carefully 

the validity of this document with respect to his product.  Manual-no.:  999198 / 29/09/2009

Repair - return  - DKD calibration

Safety and health of our staff, laws and regulations regarding the handling of dan-

gerous goods, occupational health and safety regulations and regulations regarding 

safe disposal of waste require that for all pumps and other products the 

“Health 

and safety clearance form“

 must be send to our office duly completed and signed 

before any equipment is dispatched to our premises.

Fax or post a completed copy of the health and safety clearance form to us in ad-

vance. The declaration must arrive before the equipment. Enclose a second com-

pleted copy with the product. If the equipment is contaminated you must notify the 

carrier.

No repair / DKD calibration is possible unless the correctly completed form is 

returned. Inevitably, there will be a delay in processing the equipment if infor-

mation is missing or if this procedure is not obeyed.

If the product has come in contact with chemicals, radioactive substances or other 

substances dangerous to health or environment, the product must be decontami-

nated 

prior to sending it back to the factory.

-  Return the product to us 

disassembled and cleaned

 and accompanied by a 

certificate verifying decontamination or

-  Contact an industrial cleaning and 

decontamination service

 directly or

-  Authorize  us  to  send  the  product  to  an  industrial  cleaning  facility 

at

 

your  ex-

pense.

To  expedite  repair  and  to  reduce  costs,  please  enclose  a  detailed  description  of 

the problem and the product’s operating conditions with every product returned for 

repair.

We submit

 quotations 

only on request and always at the customer’s expense. If 

an order is given, the costs incurred are offset from the costs for repair or from the 

purchase price, if the customer prefers to buy a new product instead of repairing the 

defective one.

If you do not wish a repair on the basis of our quotation, the equipment 

might be returned to you disassembled and at your charge!

In many cases, the 

components must be cleaned in the factory

 prior to repair.

For cleaning we use an environmentally responsible water based process. Unfor-

tunately  the  combined  attack  of  elevated  temperature,  cleaning  agent,  ultrasonic 

treatment and mechanical stress (from pressurised water) may result in damage to 

the paint. Please mark in the health and safety clearance form if you wish a 

repaint 

at your expense

 just in case such a damage should occur.

We also replace parts due to optical aspects upon your request.

Before returning

 the equipment ensure that (if applicable):

-  Equipment has been cleaned and/or decontaminated.

-  All inlet and outlet ports have been sealed.

-  Equipment has been properly packed, if necessary, please order an original pack-

aging (costs will be charged), marked as appropriate and the carrier has been 

notified.

-  Ensure that the completed health and safety declaration is enclosed.

We hope for your understanding for these measures, which are beyond our control.

Scrapping and waste disposal:

Dispose of the equipment and any components removed from it safely in accordance 

with all local and national safety and environmental requirements. Particular care 

must be taken with components and waste oil which have been contaminated with 

dangerous substances from the process. Do not incinerate fluoroelastomer seals 

and O-rings.

-  You may authorize us to dispose of the equipment 

at

 

your expense.

Notes on return to the factory

NOTICE

NOTICE

Содержание PC 3001 basic

Страница 1: ...y and unchanged It is strictly the users responsibility to check carefully the validity of this document with respect to his product Manual no 999198 29 09 2009 PC 3001 basic Chemistry pumping unit wi...

Страница 2: ...powerful application usage and personal safety through our products Please read these instructions for use before the initial operation of your pump VACUUBRAND diaphragm pumps are the result of many y...

Страница 3: ...inlet temperatures 9 Wetted parts 9 Pump parts 10 Kits for PC 3001 basic 11 Use and operation 12 Installing in a vacuum system 12 During operation 13 Attention Important notes regarding the use of gas...

Страница 4: ...ion between 10 C and 40 C Check the maximum temperatures if installing the pump in a cabinet or a housing and make sure ventilation is adequate Install an external automatic ventilation system if nece...

Страница 5: ...nt into a room for operation allow the equipment to warm up pay attention to water condensation on cold surfaces The diameter of the inlet and outlet pipeline should be at least as large as the diame...

Страница 6: ...t of the human body from coming into contact with vacuum The user must take suitable precautions to prevent any formation of explosive mixtures in the expansion chamber or at the outlet In case of e g...

Страница 7: ...t maximum Prevent any backpressure of gases and the backflow of condensates Never suck liquids or dust into the pump The A weighed emission sound pressure level of the pump does not exceed 70 dB A Mea...

Страница 8: ...e bar 1 1 Maximum permissible outlet pressure abso lute bar 1 1 Maximum permissible pressure absolute at gas ballast valve bar 1 2 Permissible ambient temperature storage op eration C 10 to 60 10 to 4...

Страница 9: ...ssure Permitted range of gas temperatures at inlet Continuous operation 100 mbar high gas load 10 C to 40 C Continuous operation 100 mbar low gas load 0 C to 60 C Short time 5 minutes 100 mbar low gas...

Страница 10: ...the validity of this document with respect to his product Manual no 999198 29 09 2009 PC 3001 basic Position Component 1 Chemistry diaphragm pump MD 1C VARIO 2 knob to select motor speed 3 Mains conn...

Страница 11: ...knob to the right increases the motor speed A high motor speed reduces the lifetime of diaphragms and valves Pumping at high motor speed increases the pumping speed of the pump Ensure sufficient cooli...

Страница 12: ...tack and deposits replace if necessary or use an exhaust pipeline without silencer Reduce the transmission of vibration and prevent loading due to rigid pipelines Insert elastic hoses or flexible elem...

Страница 13: ...ust The diaphragm and valves will be damaged if liquids are pumped in significant amounts Check the pump regularly for external soiling and deposits clean if necessary to avoid an increase of the pump...

Страница 14: ...rms deposits Check and clean pump heads if necessary Long term Take measures as described in section short term shutdown Separate pump from the application Close gas ballast Drain catchpots if using w...

Страница 15: ...ultimate vacuum or nor mal pumping speed Centring ring at a small flange connection not correctly posi tioned or leak in the pipeline or vacuum system Check pump directly con nect vacuum gauge direct...

Страница 16: ...999198 29 09 2009 Kits Kit AK CVC 3000 699921 Kit EK 500 699922 Accessories for vacuum controller CVC 3000 External pressure transducer VSK 3000 capacitive ceramic diaphragm sensor 1080 0 1 mbar 63665...

Страница 17: ...ensation transfer of liquids or dust The diaphragm and valves will be damaged if liquids are pumped in significant amount If the pump is exposed to corrosive gases or vapour or in case of deposits mai...

Страница 18: ...from one side of the housing cover Disassembling the housing cover at the inlet side Lay the pumping unit down with the housing cover at the side of the pump inlet facing upwards support pumping unit...

Страница 19: ...ent with respect to his product Manual no 999198 29 09 2009 View of the disassembled pump head parts Replacing the diaphragm 10 1 9 3 2 5 6 7 8 4 1 housing cover 2 valve 3 head cover 4 diaphragm clamp...

Страница 20: ...ply pressure to the diaphragm clamping disc to bring the diaphragm into the lower turning point position Press diaphragm key against diaphragm clamping disc unscrew and remove diaphragm support disc w...

Страница 21: ...side with hose connection between pump heads side with knob stand foot Assembling the housing cover at the inlet side Assemble head covers and valves Check for correct position see also fig below It...

Страница 22: ...p ing unit appropriately Use a hex key size 4 to loosen the six socket head screws at the pump head Raise the housing cover Pull off the hose from the housing cover Do not kink the hose Remove head co...

Страница 23: ...nge after the run in period Check hose connectors between pump heads and manifolds for leaks If necessary recheck pump chamber Position housing cover Pay attention to correct hose guid ance Move housi...

Страница 24: ...onditions with every product returned for repair We submit quotations only on request and always at the customer s expense If an order is given the costs incurred are offset from the costs for repair...

Страница 25: ...oxic corrosive biologically active explosive radio active nor contamination dangerous in any way has occurred the product is free of dangerous substances the oil or residues of pumped media have been...

Страница 26: ...gn ci dessus est conforme aux prescriptions de base des directives EU applicables et indiqu s en ci que concerne conception dessin et mod le vendu par nous m mes Cette d claration cesse d tre valable...

Страница 27: ...obtained under test conditions for specific applications depend on a number of factors beyond our control It is therefore strictly the users responsibility to very carefully check the validity of app...

Отзывы: