page 49 of 80
Removing the catchpots:
Catchpot at outlet:
Remove joint clip. Remove catchpot and drain conden-
sate.
Catchpot at inlet:
Admit air or inert gas (via the pump inlet) to restore at-
mospheric pressure in the catchpot before attempting
removal. Remove joint clip. Remove catchpot and drain
condensate.
Reattach drained catchpots.
+
Important
: Comply with regulations when disposing
of solvents/condensates. Recycle if possible; purify if
contaminated.
Shutdown & storage
The pump can be switched off under vacuum.
Short-term:
Has the pump been exposed to condensate?
Allow the pump to continue to run at atmospheric pres-
sure for a few minutes.
Has the pump been exposed to media which may damage
the pump materials or form
deposits
?
Check and clean pump heads if necessary.
Long-term:
Take measures as described above regarding short-term
shutdown.
Separate the pump from the application.
Close inlet and outlet ports (e.g., with transport caps).
Close the gas ballast valve.
Drain catchpots.
Store the pump under dry conditions.
NOTICE
NOTICE
Содержание MZ 2C NT+2AK
Страница 32: ...page 32 of 80 ME 4C NT 1 5 4 7 6 8 2 ME 2C NT 1 5 4 7 6 8 2...
Страница 34: ...page 34 of 80 ME 8C NT MD 4C NT 1 5 3 4 7 6 2 8 8 5 4 7 6 1 2...
Страница 57: ...page 57 of 80 Fittings and tubing of the different pump models ME 4C NT MZ 2C NT ME 8C NT MD 4C NT...
Страница 73: ...page 73 of 80 Declarations and certificates...
Страница 74: ...page 74 of 80...
Страница 78: ...page 78 of 80...
Страница 79: ...page 79 of 80...