VABCHES J4Q000GR01 Скачать руководство пользователя страница 17

STEP11

17-24

X12

4

M6X40mm

X1

10

4

X65mm

4

Please tighten the screws
to 80% first, and tighten
all screws 100% after all
parts are assembled.

A

C

B

D

E

H

H

I

I

Содержание J4Q000GR01

Страница 1: ...installation instruction carefully before installation Please use tools properly and carefully If you have any questions about the product and installation please contact us Our professional after sal...

Страница 2: ...n to keep it to avoid excessive heavy lifting Identify sort and count the parts before attempting assembly Compression dowels are lightly tapped in with a hammer Slides are labeled with an R right and...

Страница 3: ...tification Not actual size MIDDLE PANEL Qty 1 A RIGHT PANEL Qty 1 C LEFT PANEL Qty 1 3 34 B FIXED SHELF Qty 1 D PARTITION Qty 2 F BOTTOM Qty 1 E BACK PANEL Qty 2 G FRONT TABLE LEG Qty 2 I REAR TABLE L...

Страница 4: ...ize UPPER SUPPORT TUBE Qty 2 J 4 34 STORAGE BOX Qty 1 L LOWER SUPPORT TUBE Qty 2 K BOTTOM Qty 1 M 15X9 5mm CAM LOCK spare 2 X12 6 5X35mm CAM BOLT spare 2 X12 8X30mm WOODEN DOWEL spare 2 X20 M6X40mm BO...

Страница 5: ...5mm HEX KEY X11 LAMP TUBE X1 17X9 5mm LAMP BELT BUCKLE X6 ANTI TIPPING HARDWARE X1 set 5 24 Part List 5 6 7 8 9 10 11 12 13 Insert the cam bolt into the hole first then insert the cam lock and lock it...

Страница 6: ...Board Identification Not actual size 6 24 A C B D E F F G G H H I I J J K K L M...

Страница 7: ...STEP1 7 24 X16 3 8X30mm G F x 2 x 2 3 L L M...

Страница 8: ...STEP2 8 24 Proper orientation of CAM LOCK UNLOCK LOCK X8 2 6 5X35mm X8 1 15X9 5mm F F G G D 2 1 D...

Страница 9: ...STEP3 9 24 X8 5 4X40mm D F G F G E 5...

Страница 10: ...STEP4 10 24 X4 9 28 M6X20mm x 2 I H 9 9...

Страница 11: ...STEP5 11 24 X4 4 M6X40mm K J K J I I The notch is facing up The notch is facing up 4 X1 10 4X65mm...

Страница 12: ...STEP6 12 24 I I E D X4 4 M6X40mm X1 10 4X65mm 4 J J K K Please tighten the screws to 80 first and tighten all screws 100 after all parts are assembled...

Страница 13: ...STEP7 13 24 H H 4 X4 4 M6X40mm X1 10 4X65mm E D Please tighten the screws to 80 first and tighten all screws 100 after all parts are assembled J J I I...

Страница 14: ...STEP8 14 24 X2 14 4X30mm 14 D E G G H H...

Страница 15: ...STEP9 15 24 X4 2 6 5X35mm X4 3 3 5X14mm X1 set 13 8X30mm A A B C 2 3 1 UP X4 1 15X9 5mm Proper orientation of CAM LOCK UNLOCK LOCK 13...

Страница 16: ...X6 7 X1 set 11 7 C A B 3X12mm X6 12 17X9 5mm 12 STEP10 16 24 12 11 11 11 1 2 3 7 3 1...

Страница 17: ...STEP11 17 24 X12 4 M6X40mm X1 10 4X65mm 4 Please tighten the screws to 80 first and tighten all screws 100 after all parts are assembled A C B D E H H I I...

Страница 18: ...STEP12 18 24 X2 6 3 5X14mm X1 8 8 6 A C B...

Страница 19: ...STEP13 19 24 L When the ground is uneven you can rotate the feet to adjust the height Please read the following operating instructions for the use function of the light belt...

Страница 20: ...bumps or climbing We strongly recommend mounting this hardware to a wall stud and your unit NOTE The tipping restraint hardware included is for wooden stud wall construction It must be attached to a w...

Страница 21: ...21 24...

Страница 22: ...22 24...

Страница 23: ...23 24...

Страница 24: ...24 24...

Отзывы: