E
N
G
L
IS
H
37
PREPARATION FOR AUTOMATION OF
THE BASE
1.
Provide a foundation pit and arrange one or more conduits for
the passage of the electrical cabling.
2.
Assemble the 4 anchoring brackets on the mounting plate and
fasten with the 4 bolts provided.
3.
Pour the concrete into the inside of the pit and position the
base plate.
NOTE: verify that the plate is perfectly leveled and
parallel to the opening barrier.
4.
Wait for the complete setting of the concrete.
5.
Unscrew the 4 nuts that hold the base joined to the anchoring
brackets and position the rack on the plate.
NOTE: it is advisable to install the rack cabinet with the
inspection access flap turned towards the more
accessible side.
Содержание ZENIA
Страница 2: ......
Страница 9: ...ITALIANO 7 Fig 3...
Страница 11: ...ITALIANO 9...
Страница 16: ...ITALIANO 14...
Страница 34: ...ITALIANO 32 INSTALLAZIONE DELL ACCESSORIO 163604...
Страница 41: ...ENGLISH 39 Fig 3...
Страница 43: ...ENGLISH 41...
Страница 48: ...ENGLISH 46...
Страница 66: ...ENGLISH 64 INSTALLATION OF THE ACCESSORY 163604...
Страница 73: ...FRAN AIS 71 Fig 3...
Страница 75: ...FRAN AIS 73...
Страница 80: ...FRAN AIS 78...
Страница 98: ...FRAN AIS 96 INSTALLATION DE L ACCESSOIRE 163604...
Страница 105: ...ESPA OL 103 Fig 3...
Страница 107: ...ESPA OL 105...
Страница 112: ...ESPA OL 110...
Страница 130: ...ESPA OL 128 INSTALACI N DEL ACCESORIO 163604...
Страница 131: ......
Страница 132: ......