background image

   

MAINTENANCE GUIDE

Clean the inverter

Cleaning procedure is as follows:

(1) Disconnect the input and output switches.

(2) Wait ten minutes.

(3) Use a soft brush or a vacuum cleaner to clean the surface and the inlet and outlet of 

the inverter.

(4) Repeat inspection before operation - operating content.

(5) Restart the inverter.

DISPLAY PANEL

This chapter describes the panel displaying and how to operate on the panel, which 

involves the LCD display, LED indicators and operation panel.  

LED INDICATORS 

There are three LED indicators on the panel: 

(1) “Run”, operation indicator, green;

(2) “Warn” recoverable fault indicator, yellow; 

(3) “Fault”, unrecoverable fault indicator, red. 

The inverter state includes 6 states of stand-by, self-inspection, power generation, 

recoverable fault and unrecoverable fault; LED indicators are on, off and blinking. Please 

refer to the table below for detailed state of inverter and LED indicators state.

”: LED indicator is off; 

“ ” (green), “

” (yellow), “

” (red): LED indicator is blinking at every 0.25S or 0.5S;  

(Green), “

” (yellow), “

” (red): LED indicator is on.  

Table of inverter state and LED indicators

Inverter 

state 

LED 

indicators 

Description  

Stand-by 

Run
Warn
Fault

 

No power on. All indicators off.  

Self-

inspection 

Run
Warn
Fault

 

Green indicator blinks in every 0.25s, others off. Power 
on and ready for self-inspection 

Power 

generation 

Run
Warn
Fault

 

Green indicator keeps on, others off. 
Grid-tied power generation. 

Run
Warn
Fault

 

(1) Grid-tied power generation, but clock fault (A 007); 
(2) Grid-tied power generation, but DC input fault 
(A001 or E001); 
(3) Grid-tied power generation

but fan fault(E006 or 

E012); 
Green and yellow indicator keeps on, others off.  

 

Содержание VT-6603105

Страница 1: ...VELOW 9B Thank you for selecting and buying V TAC Product V TAC will serve you the best Please read these instructions carefully keep this user manual handy for future reference If you have any anothe...

Страница 2: ...er people In order to avoid personal injury damage to the inverter or other devices please strictly observe the following safety precautions This chapter mainly describes various warning symbols in op...

Страница 3: ...re is a danger of burning Do not touch It must be reliably grounded before operation Do not open the cover of inverters unauthorized The electrical parts and components inside the inverter are electro...

Страница 4: ...es Only qualified electricians are allowed to install the inverter Do not put and install the inverter on or close to combustible materials Keep the installation site away from children and other publ...

Страница 5: ...e local dealer or supplier for maintenance In order to avoid irrelevant personnel from entering the mainte nance area during maintenance temporary warning labels must be placed to warn non professiona...

Страница 6: ...C TN C S and TT grid connection When applied to the TT connection the N to PE voltage should be less than 30V SAFETY GUIDELINES PRODUCT APPEARANCE The recommended solar modules need to comply with IE...

Страница 7: ...ystem of the inverter con rming N o N ame Instructio n 1 Cover 2 LED display panel LED indicators 3 DC switch On off of the DC input optional 4 DC input port For the connection of solar modules 5 AC t...

Страница 8: ...er Single phase L N PE Single phase grid tied solar inverter Single phase grid tied solar inverter 3KW 2M 3000 5KW 2M 4600 ICONS CERTIFICATION Icons Instruction CE certification mark The inverter comp...

Страница 9: ...IMENSIONS AND WEIGHT Figure 5 Inverter dimensions Table of inverter dimension and net weight Figure 6 Paper packages dimension Table of packages dimension and gross weight W H Model H mm W mm D mm Gro...

Страница 10: ...rid tied solar system including the connection between solar modules public grid and inverter Read this chapter carefully and ensure all installation requirements are met before installation Only qual...

Страница 11: ...allation should ensure that the inverter is reliably grounded and the material of grounded metal conductor should be consistent with the metal material reserved for the grounding of the inverter BEFOR...

Страница 12: ...releasing In generally below space requirement should be met Table of detailed installation space M inimum clearance Lateral 200mm Top 450mm Bottom 450mm Do not open the cover of the inverter or repla...

Страница 13: ...the installation mode vary with the di erent installation sites It is recommended to install the inverter vertically to the rm wall or metal bracket Here we take wall installation as an example to in...

Страница 14: ...tallation bracket through M8 hex socket cap screws 4 Finally fasten the inverter and the bracket with M5 screws and tighten the screws to 2 Nm For rm installation the operators cannot release the devi...

Страница 15: ...al injuries or even death during system operation All the electrical installation must conform to the national and local electrical safety regulations Ensure all the cables are installed firmly accord...

Страница 16: ...wiring of negative pole is the same as that of the positive pole Ensure the poles of solar modules are well connected with the connectors Figure 14 Connection between DC connector and solar modules PV...

Страница 17: ...ng and short circuit protection measures in accordance with the local electrical safety codes 2 As shown in Figure 16 connect and fasten L N and PE conductors of the single phase AC grid to AC termina...

Страница 18: ...by LCD Refer to chapter 6 for LED state indicator and LCD display information In order to ensure a safe normal and stable operation of the PV power generation system all the newly installed renovated...

Страница 19: ...re the operation data Use real time monitoring software to read inverter running data regularly back up all inverter running data and stats Check the monitoring software and inverter LCD screen to mak...

Страница 20: ...pection power generation recoverable fault and unrecoverable fault LED indicators are on o and blinking Please refer to the table below for detailed state of inverter and LED indicators state LED indi...

Страница 21: ...ure abnormal E006 2 Inverter stand by DC input fault E001 Yellow indicator keeps on others off Unrecoverable fault Run Warn Fault Hardware or software fault E003 E004 E005 E008 E009 E011 E013 or E015...

Страница 22: ...y defaults Text Parameter Display Area Fault Code Status Area Figure 18 Main interface The main interface of the LCD screen is shown as the Figure above 1 The curve graph display area displays the pow...

Страница 23: ...r saved peak power and total CO2 reduction in current day Latest 7 days Total power produced total power saved and total CO2 reduction in latest 7 days Latest 1 month Total power produced total power...

Страница 24: ...Setup menu can realize parameter setup shown in table of parameters setting LCD MENUS...

Страница 25: ...LCD display Instruction RS485 Address R S 4 85 A dd re ss 0 01 1 Enter into the interface and edit the data through or And then press ENT again to the next bit After editing the three bits press ENT...

Страница 26: ...e four bits press ENT to save the edition and press ESC to exit The currency types include EUR POD CNY and USD Setup Date Time S et up D at e T im e D at e 2 01 2 0 1 1 5 T im e 1 2 1 4 3 0 1 Enter in...

Страница 27: ...ctor Limit Mode Invalid Invalid Auto Manual Limit Power 100 Power Factor Grid Tied Mode Normal Mode Power Factor 1 00 Input password 0000 The password is needed when enter into the interface of Set po...

Страница 28: ...e 0 20s ACUFFreqency 47 6Hz ACUFTime 0 20s ACOFFreqency 51 4Hz ACOFTime 0 20s Inputpassword 0000 Password is required when enter into the interface of Run Param Get the password from the supplier if n...

Страница 29: ...ACOF Time ACUV Volt phase volt ACUV Time ACOV Volt phase volt ACOV Time ACUF Frequency ACUF Time ACOF Frequency ACOF Time There are 2 protections under G83 G59 UK and PEA Thailand standards and there...

Страница 30: ...which is shown in Figure 26 There are 8 pieces of fault information in the record which is shown in Figure 26 Otherwise it will display No Fault Refer to HISTORY for more detailed information INVERTER...

Страница 31: ...ugh the panel And save the all settings and operation record Press ENT to ensure restarting and the inverter will begin to self inspect or press ESC to return Record clear C le ar a ll R ec or d S ur...

Страница 32: ...been set through the following ways LCD Screen MENU Main Menu System Info System Information Cert Area Certi cate Area V pv1 000 0V I pv1 000 0A V pv2 000 0V 01 A001 MENU Alarm p h MENU M ai n Me nu...

Страница 33: ...e of grid tied solar inverter is RS485 which includes RS485 M and RS485 S ports The RS485 M ports can communicate with private computers smart phones and so on The system monitoring solution is shown...

Страница 34: ...on is correct 3 Please download the monitoring software WinExpert and its operation instruction from our website Please download the connection instruction operation manual and commissioning tools on...

Страница 35: ...t OV Input overvoltage DC input overvoltage E003 Bus OV Bus overvoltage Internal bus voltage E004 Boost Fail Voltage boost fault Voltage boost fault of the inverter E005 Grid OC AC overcurrent Interna...

Страница 36: ...tion is enable E022 FreqChg Frequency is changed Fluctuation of grid voltage is over inverter normal sustainable range E023 PE Loss PE wire not connected The PE wire is unconnected this error code onl...

Страница 37: ...peration temperature Relative humidity M ax altitude m Displaying Systerm language Communication DC terminal Noise dB A Installation mode Protection M odel Single phase Input DC Optional Output AC Vol...