WARNING:

• This product must be disconnected from the circuit if subjected to any high voltage or 

insulation resistance testing. Irreparable damage will occur if this instruction is not 

followed

• Recommended routine test procedure in accordance with BS5266

• Daily check – check that the status GREEN LED indicator is illuminated

• Monthly functional test – simulate a mains supply failure for approx. 30 secs by 

operation of key switch or switching off a circuit breaker. Ensure normal supply is 

restored after test and the indicator status LED is illuminated

• Twice yearly conduct a one hour duration test - simulate a mains supply failure for one 

hour continuous test by operation of key switch or switching off circuit breaker. Ensure 

normal supply is restored after test and the indicator status LED is illuminated

• Annual full three hour duration test - conduct a three hour continuous duration test. 

Simulate a mains supply failure for three hour continuous test by operation of key switch 

or switching off circuit breaker. Ensure normal supply is restored after test and the 

indicator status LED is illuminated

• If the luminaire fails any of the above tests, please contact a qualified electrician. 