![V.ORLANDI RP10 Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/v-orlandi/rp10/rp10_installation-operating-and-maintenance-instructions-for-the-installer-and-the-user_847008011.webp)
REV. 00
CHAP. 2
PAG.
11/36
2.2 DIRECT INSTALLATION
Set the fifth wheel into its lead position as established by the truck manufacturer.
Fix the fifth wheel pedestals (24) to the “L” profiles on the truck side chassis
using twelve flanged M16x1.5-6g fit DIN 692 (property class 10.9) screws, special
6 mm thickness washers and self-braking flanged M16x1.5-6H DIN 6923
(property class 10) nuts.
Torque wrench setting 270-300 Nm.
Truck side chassis
24
24
Once installation is complete, proceed as instructed in section 2.4 -
SETTING UP FOR OPERATION - page 13/36.
N
O
T
E
FIFTH WHEEL Rp10
INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
Содержание RP10
Страница 36: ...NOTES NOTES ...