6. Attach the Y carriers on top of the forks. Be sure to align the wheels on the Y carriers
to the rails.
7. Insert the nut in the thumbscrew, and tighten with the Y carriers.
8. Align the X-axis perpendicular to the Y-axis before continuing. As long as the corners
are 90 degrees, you can slide the X-axis to the motors - and use them as a reference.
9. Fasten the X-axis to the Y carrier on the B-C side with an M5 10 mm bolt at the top.
10. Fasten the X-axis to the Y carrier and the X end stop flag on the A-D side with an M5
14 mm bolt at the top.
11. Slide the X idlers outside the Y carrier. Use an allen key or similar to ensure that the
holes on the sides align. Ensure that the tee nut is placed properly.
12. Insert the M5 14 mm screws, and tighten carefully.
13. Tighten all screws carefully. Do not use too much force.
14. Apply a little low-strength threadlocker on the hex bolts under the X idler, before
fastening the M5 nut. Do not tighten too much, or you will break the plastic.
V-King MK2 Assembly Manual 2021-02-27
19 / 41
Содержание MK2
Страница 3: ...Base Frame Assembly V King MK2 Assembly Manual 2021 02 27 3 41 https vkingprinter com...
Страница 9: ...X Axis Assembly V King MK2 Assembly Manual 2021 02 27 9 41 https vkingprinter com...
Страница 23: ...Z Drive Assembly V King MK2 Assembly Manual 2021 02 27 23 41 https vkingprinter com...
Страница 40: ...Thermal fuse mounted on the bed V King MK2 Assembly Manual 2021 02 27 40 41 https vkingprinter com...