Assembly
2
Complete the fitting as shown and if necessary, close the open section of the metal bracket
slightly with a pair of pliers as this will help to retain the cables. Connect the lower part of
the Exercise Monitor Link Wire (18) to the Exercise Monitor Sensor Wire (20),
ensuring a tight connection. Remove the 4 x M8 x 16mm Allen Bolts (16), 4 x M8 Spring
Washers (66) and 4 x M8 Curved Washers (56) from the Main Frame (1). Carefully lower
the Handlebar Upright (2) onto the Main Frame (1), then loosely fit the 4 x M8 x 16mm
Allen Bolts (16), 4 x M8 Spring Washers (66) and 4 x M8 Curved Washers (56)
previously removed.
Note
Do NOT tighten the Handlebar
Upright at this stage.
A-1.Hold the Tension Cable (19) below the metal bracket. Guide the lower part of the
into the formed metal loop on the
A-2.Still holding the Tension Cable (19), pull the Tension Control Knob INNER Cable (17)
A-3/A-4. Slowly release the tension on the UPPER Cable and guide it carefully into the
hole in the top of the Metal Bracket.
INNER Cable of the Tension Control Knob (17)
INNER Cable of the Tension Cable.
away from the Metal Bracket (you will notice some resistance at this stage) and
guide the INNER Cable through the open slot in the Metal Bracket.
The Tension Control Knob (17)
must be set at position "1".
A-1
A-2
A-3
A-4
17
19
17
66
Page 1
9
Содержание KPE-12/1
Страница 2: ......
Страница 12: ...Exercise Notes Page 12...
Страница 22: ...Assembly 65 66 41 Page 22...