Страница 1: ...the parts list for each height before commencing assembly Personnel should be qualified or competent to erect this tower Please consult the PASMA s code of practice for full information on the use of...
Страница 2: ...intenance 5 Components and Weights 7 Assembly 8 Dismantling 15 Configurations and Weights 16 Risk Assessment Form 17 UTS 700 STAIRWELL Instruction Manual Mobile Access Tower UTS SALES REPAIRS LTD UNIT...
Страница 3: ...e assembly or erection of this Mobile Access Tower MAT please ensure that A risk assessment has been done and all safety equipment is on site The ground conditions will take the working loads of MAT a...
Страница 4: ...stabilisers to provide ground clearance Unlock the castor wheels Move with manual force only and only from the base Beware of overhead obstructions live wires hanging apparatus or other objects Do not...
Страница 5: ...a complete structure Always keep this instruction manual safe Broken damaged or incorrect components must never be used The equipment shall be quarantined and assessed for replacement repair or destr...
Страница 6: ...from the inside facing OUTWARD BUT NEVER INWARD FITTING ADJUSTABLE BASE FEET Take the adjustable leg assembly complete with its base plates make sure that all the adjusting nuts are positioned down a...
Страница 7: ...5 6 9 1 9m Diagonal Brace 2 1 4 1 5m 6 Rung Frame 7 10 Complete Toe Board Set 6 5 1 5m Walkthrough Frame 4 11 S1 Stabiliser 5 9 6 Walkthrough Frame Ladder 6 12 Wall Prop 4 Identifying Components and T...
Страница 8: ...assembly with base plates into the base of a walkthough frame the repeat this with the other walkthough frame 1 Attach one horizontal brace red to vertiacal of the end frame claws facing outwards just...
Страница 9: ...gonal brace blue placed in the opposite direction to the lower diagonal brace blue forming a zig zag pattern See photos it should be positioned on the bottom rung of the higher walkthough frame and th...
Страница 10: ...er checking it is level Ensuring the clip on ladder is locked in place with hooks facing out see photo climb up to and partially through the platform and adopt the 3T Through the Trapdoor position wit...
Страница 11: ...5 The tower should be stabilised or proped against the building when being erected and used In confined spaces the tower may well be trapped within a stairwell and require minimal further stabilisatio...
Страница 12: ...the lower diagonal brace blue forming a zig zag pattern See photos it should be positioned on the bottom rung of the higher step access frame and the 5th rung of the 6 rung frame on the opposite side...
Страница 13: ...artially through the platform and adopt the 3T Through the Trapdoor position with your feet on the rungs below Fit a 6 rung guardrail frame to the 6 rung frame and four 1 5M horizontal braces red to t...
Страница 14: ...nt s 6 7 pages 11 12 If going higher repeat steps 8 and 9 adding 6 rung frames platforms and horizontal braces every 1 5m and diagonal braces continuing the zig zag pattern as shown in the images When...
Страница 15: ...l frames can be removed NOTES DO NOT OVER REACH and NEVER DROP COMPONENTS when dismantling always lower them to the ground STABILISERS WALL PROPS It is the users responsibility to complete a risk asse...
Страница 16: ...ce 5 9 1 9m Diagonal Brace 3 4 Complete Toe Board Set 1 1 1 1 S1 Stabiliser 4 4 4 4 Wall Prop 2 4 6 8 Approx Tower Shelf weight Kgs 1 5m 101 1 1367 172 3 207 9 700 STAIRWELL Notes Please Note It is th...
Страница 17: ......
Страница 18: ...ge 18 UTS SALES REPAIR LTD UNIT 1A CANTERBURY INDUSTRIAL PARK ISLAND ROAD HERSDEN CANTERBURY KENT CT3 4HQ TEL 01227 860085 WWW TOWERSANDPODIUMS CO UK Notes DOC NO SW001 VERSION 1 1 DATE 01 01 21 APPRO...